PDA

View Full Version : Sea Esta @ Pasir Ris - By Hoi Hup Sunway Pasir Ris Pte Ltd



Pages : 1 2 3 4 5 6 [7] 8 9 10

v_esta
29-01-14, 19:46
Just wonder why so early they start to paint ????
Expected TOP Q3 2015, mean they paint 1.5 yr ahead

;)

I was wondering the same thing!

radha08
29-01-14, 20:05
;)

I was wondering the same thing!

maybe the paint got special offer $$ during festive season:D:D:D

Sea Esta
29-01-14, 23:11
This is just a first layer of base paint :rolleyes:.

I also agreed that it is just a base coat.

Sea Esta
30-01-14, 09:39
Happy lunar new year to all Sea Esta owners n fans.

We will be celebrating the year of Monkey in Sea Esta.

PS: Assuming TOP in Q3 of 2015. 2014 = Horse, 2015 = Sheep, 2016 = Monkey

radha08
30-01-14, 10:54
Happy lunar new year to all Sea Esta owners n fans.

We will be celebrating the year of Monkey in Sea Esta.

PS: Assuming TOP in Q3 of 2015. 2014 = Horse, 2015 = Sheep, 2016 = Monkey

hoo hoo ha ha said the monkey:D:D:D

CondoWE
30-01-14, 13:47
hoo hoo ha ha said the monkey:D:D:D

This one for you....http://i1297.photobucket.com/albums/ag30/CondoWe/th_zpsc86d7746.jpg (http://s1297.photobucket.com/user/CondoWe/media/th_zpsc86d7746.jpg.html):D:D:D !

radha08
30-01-14, 15:40
This one for you....:D:D:D !


:banana::banana::banana::banana::banana:tank u:D:D:D

BOB
30-01-14, 16:46
Happy Chinese New Year to all!!

v_esta
31-01-14, 07:14
Happy Lunar new year! !!!!!!

Huat ah! :cheers1:

CondoWE
31-01-14, 07:52
http://i1297.photobucket.com/albums/ag30/CondoWe/Chinese-New-Year-2014-Horse-Wallpaper-2-9_zps5133ceb1.jpg (http://s1297.photobucket.com/user/CondoWe/media/Chinese-New-Year-2014-Horse-Wallpaper-2-9_zps5133ceb1.jpg.html)

CondoWE
06-02-14, 20:37
Today is the 7th day of the lunar year! (人日)

Everybody' Birthday!

http://i1297.photobucket.com/albums/ag30/CondoWe/1186205_696375350413522_1129649300_n_zps2b59ff0b.jpg (http://s1297.photobucket.com/user/CondoWe/media/1186205_696375350413522_1129649300_n_zps2b59ff0b.jpg.html)

DPan
06-02-14, 20:48
Wishing all Sea Esta Bro & Sis - 發發發

v_esta
08-02-14, 15:45
I think they must have stopped work for quite a while since it's the festive holidays.... anyone went to look see look see? Hehe...

Sea Esta
08-02-14, 21:44
Progress still good. Average 1 level per 3 weeks. :D

8th February 2014 - Close Up - Level 4 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 10 of Block 26 and Level 12 of Block 28 completed. Level 1 of Blk 30 in progress.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-prn1/t31/q71/s720x720/1622383_475121139261220_521256026_o.jpg

8th February 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-prn1/t31/q75/s720x720/1534807_475121259261208_452689221_o.jpg

8th February 2014 - Sea Esta from Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t31/q73/s720x720/1275617_475121465927854_807700552_o.jpg

8th February 2014 - Blk 18 is at Level 4.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-prn2/t31/q71/s720x720/1602039_475121575927843_953447369_o.jpg

8th February 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-ash3/t31/q72/s720x720/1801381_475121742594493_244993601_o.jpg

8th February 2014 - Blk 22 is at Roof Level.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-prn2/t31/q75/s720x720/1559447_475121855927815_1691656719_o.jpg

8th February 2014- Blk 26 is at Level 10.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t31/q71/s720x720/1780143_475121982594469_2001156620_o.jpg

8th February 2014 - Blk 28 is at Level 12.
https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-prn1/t31/q71/s720x720/1077597_475122145927786_1245366134_o.jpg

8th February 2014 - Blk 30 is at Level 0.
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t31/q75/s720x720/1801388_475122272594440_1943302047_o.jpg

8th February 2014 - Construction of the bin centre and substation.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-prn2/t31/q71/s720x720/1781388_475122432594424_750729092_o.jpg

CondoWE
11-02-14, 13:36
Just wonder whether have they started to build the swimming pools :cheers1: ?

Sea Esta
11-02-14, 14:11
Just wonder whether have they started to build the swimming pools :cheers1: ?

I don't think so. The land where Sea Esta is on is already very small. I believe Straits Construction is using the area where the swimming pool should be to store construction materials. There are also cranes there.

I believe it is a flat land now and the swimming pool should be build towards the end when all blocks are completed and the cranes removed.

clemdale24
11-02-14, 14:32
Is it me or is this the epitomy of a concrete jungle? (I hope its me) :(

CondoWE
11-02-14, 16:18
I don't think so. The land where Sea Esta is on is already very small. I believe Straits Construction is using the area where the swimming pool should be to store construction materials. There are also cranes there.

I believe it is a flat land now and the swimming pool should be build towards the end when all blocks are completed and the cranes removed.

But what I think is It will be more difficult for them to dip the hole for the swimming pool once the last Blk 30 built up as there aren't spaces for the crane or bulldozer to move in and out liao :scared-4:.

Sea Esta
12-02-14, 07:55
But what I think is It will be more difficult for them to dip the hole for the swimming pool once the last Blk 30 built up as there aren't spaces for the crane or bulldozer to move in and out liao :scared-4:.

I think to dig the swimming pool, all they need is this.

http://www.traderscity.com/board/userpix37/26665-excavator-wheel-loader-bulldozer-crawler-crane-track-roller-1.gif

The gap between blk 30 and 18 should be enough for such a machine to pass thru.

:D

NV2010
12-02-14, 08:31
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-prn1/t31/q71/s720x720/1622383_475121139261220_521256026_o.jpg



http://i1292.photobucket.com/albums/b575/sglife/main_zps765d67f9.png

iwantgizmos
12-02-14, 08:37
i vote sea esta complete first !!!

alamak
12-02-14, 08:46
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-prn1/t31/q71/s720x720/1622383_475121139261220_521256026_o.jpg



http://i1292.photobucket.com/albums/b575/sglife/main_zps765d67f9.png


Now a day, condos structure/form and layout are so much like HDB flats BTO if not for the extended Balcony, you won't guess it a Private Condo.

radha08
12-02-14, 10:17
Now a day, condos structure/form and layout are so much like HDB flats BTO if not for the extended Balcony, you won't guess it a Private Condo.


big difference hdb bto someone is holding u by the ballzzzz:D..cannot do anything once u buy bto...cannot rent out cannot invest other property:cool:

CondoWE
13-02-14, 09:01
big difference hdb bto someone is holding u by the ballzzzz:D..cannot do anything once u buy bto...cannot rent out cannot invest other property:cool:

Still can rent and invert other properties la but hor must hold the ball till after MOP nia :banghead:!

DMCK
13-02-14, 10:02
big difference hdb bto someone is holding u by the ballzzzz:D..cannot do anything once u buy bto...cannot rent out cannot invest other property:cool:

they hold ur ball becos you paid the price

radha08
13-02-14, 15:27
dunno if i got wrong feeling but the corner jacuzzi pool area feels like kinda small area...when i pass by other day:confused:

v_esta
14-02-14, 15:02
dunno if i got wrong feeling but the corner jacuzzi pool area feels like kinda small area...when i pass by other day:confused:

Oh no!
I hope not! Jacuzzi is one of the features I am looking forward to.

radha08
14-02-14, 15:33
Oh no!
I hope not! Jacuzzi is one of the features I am looking forward to.

next time u drop by check it out...i may be wrong...i hope:o

v_esta
14-02-14, 22:42
next time u drop by check it out...i may be wrong...i hope:o

But everytime I dropped by, I can't go in leh... how to see leh...
:p

iwantgizmos
14-02-14, 23:57
But everytime I dropped by, I can't go in leh... how to see leh...
:p

Bring along some food or goodies for these guys, then ask nicely...
Surely can go in :):):)

radha08
15-02-14, 10:34
take bus 354....can see;)...actually thats what i did sometime back....cos going to the chalet from pasir ris mrt...anyway big or small guess nothing can be done....already buy;)

CondoWE
18-02-14, 18:54
knock...knock...

http://i1297.photobucket.com/albums/ag30/CondoWe/hellooooois-anybody-home_zps42ec77eb.jpg (http://s1297.photobucket.com/user/CondoWe/media/hellooooois-anybody-home_zps42ec77eb.jpg.html)

This forum seems non active for quite a while liao :rolleyes:.....any surprise construction progress to tell or pictures to share...:jaw-dropping: !

radha08
18-02-14, 20:56
a lot of the units starting to do up the inside...i can see some units getting paint on inside...at night also there is some activity going on by the workers...looking good...:)

Sea Esta
19-02-14, 02:00
a lot of the units starting to do up the inside...i can see some units getting paint on inside...at night also there is some activity going on by the workers...looking good...:)

The bottleneck seems to be blk 30. The bin centre n substation seems to be faster than blk 30. :(

8th February 2014 - Construction of the bin centre and substation.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-prn2/t31/q71/s720x720/1781388_475122432594424_750729092_o.jpg[/QUOTE]

Good house
19-02-14, 04:15
a lot of the units starting to do up the inside...i can see some units getting paint on inside...at night also there is some activity going on by the workers...looking good...:)



Saw TV set installed for the workers for their entertainment leh.:D

CondoWE
19-02-14, 07:58
The bottleneck seems to be blk 30. The bin centre n substation seems to be faster than blk 30. :(

8th February 2014 - Construction of the bin centre and substation.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-prn2/t31/q71/s720x720/1781388_475122432594424_750729092_o.jpg[/QUOTE]

I think the 30 is the last to build after all includes swimming pools so that the crane , bulldozer...can move out and station at the outer to final build the 30 lor...:rolleyes:

radha08
20-02-14, 13:11
Saw TV set installed for the workers for their entertainment leh.:D


so they stay away from little india:spliff:

ilgr
27-02-14, 14:49
guys, go see vacanza@east thread. same builders as ours - Straits Construction. hopefully we won't face as many defects issues.

Sea Esta
01-03-14, 22:09
Construction Progress - 1st March 2014

1st March 2014 - Close Up - Level 6 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 10 of Block 26, Level 12 of Block 28 and Level 1 of Blk 30 completed.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-frc1/t31/q71/s720x720/1795256_483233515116649_42679692_o.jpg

1st March 2014 - Panoramic View.
https://scontent-b.xx.fbcdn.net/hphotos-ash3/t31/q71/s720x720/1596976_483233671783300_2131221391_o.jpg

1st March 2014 - Sea Esta from Pasir Ris Link.
https://scontent-b.xx.fbcdn.net/hphotos-frc3/t31/q71/s720x720/1980364_483233821783285_792301786_o.jpg

1st March 2014 - Blk 18 is at Level 6.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-frc3/t31/q71/s720x720/1890364_483233951783272_1546231522_o.jpg

1st March 2014 - Blk 18 is at Level 6 (Pool Side).
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t31/q71/s720x720/1795152_483234151783252_620274474_o.jpg

1st March 2014 - Blk 20 is at Roof Level.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t31/q71/s720x720/1909159_483234321783235_1568236157_o.jpg

1st March 2014 - Blk 22 is at Level 13.
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t31/q71/s720x720/1801152_483234481783219_1950797270_o.jpg

1st March 2014- Blk 26 is at Level 10.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t31/q74/s720x720/1973298_483234968449837_111851346_o.jpg

1st March 2014 - Blk 28 is at Level 12.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-prn1/t31/q71/s720x720/1979214_483235125116488_1335223948_o.jpg

1st March 2014 - Blk 30 is at Level 1.
https://scontent-b.xx.fbcdn.net/hphotos-ash3/t31/q71/s720x720/1781128_483235265116474_1860774051_o.jpg

1st March 2014 - The bin centre and substation
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t31/q71/s720x720/1800089_483235401783127_1425910142_o.jpg

1st March 2014 - The Pool Side Units.
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t31/q77/s720x720/1064763_483235558449778_1198982688_o.jpg

CondoWE
02-03-14, 17:05
Construction Progress - 1st March 2014


Thanks for the updating :cheers4:.

radha08
02-03-14, 21:27
Thanks for the updating :cheers4:.

thanks x 2;):cheers1::cheers1:

Sea Esta
03-03-14, 02:32
Thanks for the updating :cheers4:.


thanks x 2;):cheers1::cheers1:

:D:cheers4: .

shahrin999
05-03-14, 10:21
guys, go see vacanza@east thread. same builders as ours - Straits Construction. hopefully we won't face as many defects issues.

Yup, saw some units claiming there are defects. I do hope ours turn out fine.

v_esta
06-03-14, 07:05
Thanks for your update, Sea Esta!

Btw, i just saw the thread on Vacanza. Read a few posts... OMG! Seems very terrible. Seems like they need to do up a number of items before they can move in.

CondoWE
07-03-14, 08:24
Thanks for your update, Sea Esta!

Btw, i just saw the thread on Vacanza. Read a few posts... OMG! Seems very terrible. Seems like they need to do up a number of items before they can move in.

Based on my personal experiences, it is not uncommon for all properties to have minor defects includes HDB. As long as they can rectify the issues to your satisfactory level and prior to your move in hor :cheers1:.

v_esta
11-03-14, 16:28
Hmmm.. ok. Minor rectifications are alright, I guess. Just thought the Vacanza@east ones seems like quite a handful..

radha08
12-03-14, 12:24
vacanza next to "PIE"...we are next to "SEA":D:D:D

CondoWE
14-03-14, 15:41
vacanza next to "PIE"...we are next to "SEA":D:D:D

Even better if next to MRT.

radha08
15-03-14, 13:51
Even better if next to MRT.

pray hard got chance:cheers1:

v_esta
16-03-14, 15:46
As of 14th March afternoon..

From far:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0759_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0759.JPG)

Zoomed in.. block 30 at level 3:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0757_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0757.JPG)

Sub station:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0760_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0760.JPG)

Block 18 level 7, block 20 roof:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0764_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0764.JPG)

Block 18 zoomed in:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0766_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0766.JPG)

Block 22:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0773_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0773.JPG)

Block 26 and 28:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0774_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0774.JPG)

Block 28:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0778_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0778.JPG)

Block 18 again:

https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0780_small.jpg (https://dl.dropboxusercontent.com/u/44782169/2014-03-14/IMG_0780.JPG)

v_esta
16-03-14, 15:49
The almost completed block 20 already looks awesome... :D:D

CondoWE
18-03-14, 12:38
Thanks for the update :cheers1:.

radha08
18-03-14, 22:50
The almost completed block 20 already looks awesome... :D:D

must be your block:D:D:D

CondoWE
20-03-14, 11:16
pray hard got chance:cheers1:

Not just pray it to build near us but also hope to build fast :simmering:, best before 2017...:D:D:D !

di
20-03-14, 23:14
Not just pray it to build near us but also hope to build fast :simmering:, best before 2017...:D:D:D !

When is the TOP of sea esta ?

radha08
21-03-14, 10:25
Not just pray it to build near us but also hope to build fast :simmering:, best before 2017...:D:D:D !

bullet train...;)

ilgr
21-03-14, 10:52
Not just pray it to build near us but also hope to build fast :simmering:, best before 2017...:D:D:D !

Hope build at the carpark between downtown east and sea horizon.

CondoWE
21-03-14, 13:27
Hope build at the carpark between downtown east and sea horizon.

Agreed...:cheers4:!

v_esta
22-03-14, 10:07
must be your block:D:D:D

No leh... :P

Mine still sprouting... haha...

v_esta
22-03-14, 10:12
When is the TOP of sea esta ?

Officially is 2016.... :)

v_esta
22-03-14, 10:13
Hope build at the carpark between downtown east and sea horizon.

Totally agree... but someone actually mentioned that from the map of the new mrt lines that it's not possible to be there, right?

Sea Esta
22-03-14, 18:31
Construction Progress on 22nd March 2014

22nd March 2014 - Close Up - Level 7 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 11 of Block 26, Level 12 of Block 28 and Level 2 of Blk 30 completed.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-prn1/t1.0-9/1959559_490888337684500_1510731051_n.jpg

22nd March 2014 - Panoramic View.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-ash3/t1.0-9/1150942_490888451017822_7109855_n.jpg

22nd March 2014 - Sea Esta from Pasir Ris Link.
https://scontent-b.xx.fbcdn.net/hphotos-ash4/t1.0-9/10011489_490888554351145_889957356_n.jpg

22nd March 2014 - Blk 18 is at Level 7.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-prn1/t1.0-9/1939928_490888627684471_1493901311_n.jpg

22nd March 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-prn1/t1.0-9/1012271_490888717684462_186702674_n.jpg

22nd March 2014 - Blk 20 is at Roof Level. (Pool Side)
https://scontent-b.xx.fbcdn.net/hphotos-ash4/t1.0-9/1098234_490888814351119_604433249_n.jpg

Blk 22 is at Roof Level.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/1493254_490888914351109_231925007_n.jpg

22nd March 2014 - Blk 22 is at Roof Level. (Pool Side)
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/1911650_490888974351103_1631262755_n.jpg

22nd March 2014 - Blk 26 is at Level 11.
https://scontent-b.xx.fbcdn.net/hphotos-frc1/t1.0-9/1966871_490889227684411_1829970465_n.jpg

22nd March 2014 - Blk 28 is at Level 12.
https://scontent-b.xx.fbcdn.net/hphotos-frc1/t1.0-9/1960076_490890087684325_485543865_n.jpg

22nd March 2014 - Blk 30 is at Level 2.
https://scontent-b.xx.fbcdn.net/hphotos-frc1/t1.0-9/734460_490890281017639_2088353052_n.jpg

22nd March 2014 - The bin centre and substation.
https://scontent-b.xx.fbcdn.net/hphotos-prn1/t1.0-9/923540_490890397684294_1188286056_n.jpg

22nd March 2014 - 22nd March 2014 - The bin centre and substation. (Inner Side). Seastrand and Watercolours are in the background.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t1.0-9/1920211_490890471017620_636569344_n.jpg

22nd March 2014 - The gap between Blk 18 and Blk 20.
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t1.0-9/10151126_490890624350938_464038273_n.jpg

22nd March 2014 - The Worker Quarter. This is where the tennis court will be located.
https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/10007012_490890691017598_518375701_n.jpg

22nd March 2014 - Air-cons installation has started.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t1.0-9/10014625_490890954350905_1006959404_n.jpg

22nd March 2014 - A new banner.

https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/1920312_490891131017554_1285973594_n.jpg

22nd March 2014 - Traffic light installation at the junction of Pasir Ris Rise and Jalan Loyang Besar.
https://scontent-b.xx.fbcdn.net/hphotos-ash3/t1.0-9/1174877_490891211017546_1696953440_n.jpg

radha08
25-03-14, 22:22
Officially is 2016.... :)

faster faster faster PLEAseeee:D:D:D

DPan
25-03-14, 23:36
faster faster faster PLEAseeee:D:D:D

Received letter for 3rd & 4th payment.
Total paid = 50%
Should be fast
:cheers4::cheers4:

DuaNehNehChioBu
25-03-14, 23:37
Wait hold on ! From the pic above i notice balcony is METAL RAILING ? :beats-me-man:

di
26-03-14, 08:26
Wait hold on ! From the pic above i notice balcony is METAL RAILING ? :beats-me-man:

looks like it..

is it supposed to be that?

I think this is a good development. When did it launch?

ilgr
26-03-14, 12:51
Wait hold on ! From the pic above i notice balcony is METAL RAILING ? :beats-me-man:

metal railing is damn good lor. dont need to clean, wind can blow in better and cooler cos less refraction from the sun.

CondoWE
26-03-14, 17:03
Received letter for 3rd & 4th payment.
Total paid = 50%
Should be fast
:cheers4::cheers4:

So fast? which stack are you in?

CondoWE
26-03-14, 17:05
metal railing is damn good lor. dont need to clean, wind can blow in better and cooler cos less refraction from the sun.

Agreed. Metal railing is good but Stainless steel is better..:D !

Handsome R
26-03-14, 18:02
Agreed. Metal railing is good but Stainless steel is better..:D !

The big four uses metal/stainless steel railing, sea esta railing for balcony is the nicest and better looking.

DPan
26-03-14, 21:09
So fast? which stack are you in?

Stack 20 :)

DuaNehNehChioBu
26-03-14, 21:52
The big four uses metal/stainless steel railing, sea esta railing for balcony is the nicest and better looking.

STOP deceiving yourself and others lah. UGLY LIKE SHIT.


metal railing is damn good lor. dont need to clean, wind can blow in better and cooler cos less refraction from the sun.


Fast ERODE....Faster RUSTY :rolleyes:

Strata
26-03-14, 22:05
STOP deceiving yourself and others lah. UGLY LIKE SHIT.




Fast ERODE....Faster RUSTY :rolleyes:

Ya lor...facing the sea..salt water...very bad for metal objects...

mamamee88
27-03-14, 09:19
STOP deceiving yourself and others lah. UGLY LIKE SHIT.

Beautiful or ugly is very subjective...maybe also depends on the individual's capability in appreciating the design/art.

CondoWE
27-03-14, 09:27
Ya lor...facing the sea..salt water...very bad for metal objects...

Far away from SEA like Stratum better har..:doh:!

ilgr
27-03-14, 12:44
Far away from SEA like Stratum better har..:doh:!

Stratum (hehe what a name) facing the elias mall, cc and school. :cheers1:

DuaNehNehChioBu
27-03-14, 13:48
Beautiful or ugly is very subjective...maybe also depends on the individual's capability in appreciating the design/art.

Subjective ? Don't mislead others lah you JOKER mama mee AH ! LOL :D

Your Nice Jail Railing Looking Below :doh:

http://images.brisbanetimes.com.au/2010/12/13/2092154/jail-420-420x0.jpg

DuaNehNehChioBu
27-03-14, 13:54
Ya lor...facing the sea..salt water...very bad for metal objects...

Agreed with u strata.
There is NO such thing as STAINLESS STEEL. No one can guarantee 100% No Rust...That is bull crap talk..Especially property agents and Owners who wish to sell their unit love talking big to entice naive buyers.

teddybear
27-03-14, 16:23
Stainless steel? Unless you buy those high quality expensive ones, many of the so-called "stainless steel" will rust after 3 years when placed in bathroom (not to mention near sea some more!)! :doh:
The expensive one hor, eg just 1 simple stainless steel hand-grip bar costs >$300 !!! :doh:


Agreed with u strata.
There is NO such thing as STAINLESS STEEL. No one can guarantee 100% No Rust...That is bull crap talk..Especially property agents and Owners who wish to sell their unit love talking big to entice naive buyers.

Strata
27-03-14, 18:57
Stratum (hehe what a name) facing the elias mall, cc and school. :cheers1:

Im stating the fact. Nothing personal unlike you.

mamamee88
27-03-14, 22:06
Subjective ? Don't mislead others lah you JOKER mama mee AH ! LOL :D

Your Nice Jail Railing Looking Below :doh:

http://images.brisbanetimes.com.au/2010/12/13/2092154/jail-420-420x0.jpg

Your picture is so hilarious...what a joker...:D:D:D!

The balcony's railing is not at full height like the jail picture that you have posted.

See the picture below...Maybe the one that you own is of full height like the jail (that's why you know so well)??

http://i328.photobucket.com/albums/l350/mamamee88/Sea_esta_artist_illustration1_zps4930a000.jpg (http://s328.photobucket.com/user/mamamee88/media/Sea_esta_artist_illustration1_zps4930a000.jpg.html)

CondoWE
27-03-14, 22:43
Stainless steel? Unless you buy those high quality expensive ones, many of the so-called "stainless steel" will rust after 3 years when placed in bathroom (not to mention near sea some more!)! :doh:
The expensive one hor, eg just 1 simple stainless steel hand-grip bar costs >$300 !!! :doh:

No need high quality stainless steel :doh:, just apply marine-grade rust prevention primer/anti rust marine paint and top coat to the area on any normal type of metal or iron will be able to achieve long lasting result liao :rolleyes:.

v_esta
27-03-14, 22:53
Stack 20 :)

And that is the stack that I said looks awesome.... :D

v_esta
27-03-14, 23:04
metal railing is damn good lor. dont need to clean, wind can blow in better and cooler cos less refraction from the sun.

My sis-in-law's flat also came with metal railings... and it's so super windy! Really has a very nice feel... :cheers1:

v_esta
27-03-14, 23:10
Hey, bros... from one of the photos by bro Sea Esta, the aircon seems to be Mitsubishi hor?

:o

ilgr
28-03-14, 00:29
Your picture is so hilarious...what a joker...:D:D:D!

The balcony's railing is not at full height like the jail picture that you have posted.

See the picture below...Maybe the one that you own is of full height like the jail (that's why you know so well)??

http://i328.photobucket.com/albums/l350/mamamee88/Sea_esta_artist_illustration1_zps4930a000.jpg (http://s328.photobucket.com/user/mamamee88/media/Sea_esta_artist_illustration1_zps4930a000.jpg.html)

He's a shit stirrer.

Sea Esta
28-03-14, 03:20
Hey, bros... from one of the photos by bro Sea Esta, the aircon seems to be Mitsubishi hor?

:o

It does look like Mitsubishi.

v_esta
31-03-14, 10:22
Would be good if it's Mitsubishi. :D

CondoWE
02-04-14, 13:12
QUOTE=DPan;469237]Received letter for 3rd & 4th payment.
Total paid = 50%
Should be fast
:cheers4::cheers4:[/QUOTE]

Beside bro DPan, anyone received 4th payment notice/letter from the bank :rolleyes:?

radha08
04-04-14, 07:10
QUOTE=DPan;469237]Received letter for 3rd & 4th payment.
Total paid = 50%
Should be fast
:cheers4::cheers4:

Beside bro DPan, anyone received 4th payment notice/letter from the bank :rolleyes:?[/QUOTE]


mine still 2nd payment:cool:

Good house
04-04-14, 10:57
Beside bro DPan, anyone received 4th payment notice/letter from the bank :rolleyes:?


mine still 2nd payment:cool:[/QUOTE]

Advantage of ground unit:)

CondoWE
04-04-14, 22:16
mine still 2nd payment:cool:

Bro, you stack 20 or 28 gndflr?

CondoWE
05-04-14, 09:40
Heard from my colleague who stay at Pasir Ris told me that Ripple bay speed up the construction liao so how is Sea Esta now?

Anyone taking photo this month?

bubblez
06-04-14, 16:48
mine still 2nd payment:cool:

Advantage of ground unit:)[/QUOTE]

yours different development la

v_esta
06-04-14, 18:24
Advantage of ground unit:)

You got ground unit ? :)

Good house
06-04-14, 21:44
Advantage of ground unit:)

yours different development la[/QUOTE]

I am refering to bro Redha ground unit.

This way this forum quote n cite original post very confusing, can cause a lot of mis undrstanding leh:scared-2:

Good house
06-04-14, 21:46
You got ground unit ? :)

Just like bro redha, patio lover:)

v_esta
07-04-14, 09:24
Just like bro redha, patio lover:)

Cool... Is yours pool facing?
Just went to see see over the weekend and saw Watercolors seems to be completed real soon. Any news of when is the TOP?

Good house
07-04-14, 10:05
Official TOP next June, but rumour this December;)

ilgr
07-04-14, 10:43
Official TOP next June, but rumour this December;)

From whom did you hear from?

bubblez
07-04-14, 10:59
Official TOP next June, but rumour this December;)

official TOP is June 2016. so is it this year Dec or next year Dec?

JeffKoh
07-04-14, 11:01
official TOP is June 2016. so is it this year Dec or next year Dec?

HI, is this year Dec.

Good house
07-04-14, 11:06
I suppose everyone wanted to TOP fast, some said Oct, some said Dec, some said Feb. Well only time will tell.;)

Sea Esta
08-04-14, 00:36
HI, is this year Dec.

So fast? Good for Watercolours.

v_esta
08-04-14, 10:37
Yah. I see the progress is very fast! Highly likely to TOP this year end.

Happy for you, neighbor! :)

Do invite us to your new home when it's done!

Good house
08-04-14, 10:40
Yah. I see the progress is very fast! Highly likely to TOP this year end.

Happy for you, neighbor! :)

Do invite us to your new home when it's done!

Thank you bro, we will meet :)
Can`t wait to see your beautiful swimming pool too

AG
09-04-14, 11:48
I got the notice from lawyer for 3rd installment.
Bank already release the payment, but i did not get anything from bank. :scared-4:

CondoWE
09-04-14, 13:24
I got the notice from lawyer for 3rd installment.
Bank already release the payment, but i did not get anything from bank. :scared-4:

Be patient, bank sure adjust your payment soon probably next month.

CondoWE
11-04-14, 18:09
Any update?

Good house
11-04-14, 20:51
How about this one.......Can you spot the BiG Four in URA master plan sand model

https://dl.dropbox.com/s/c5mc6vnqgf0cx8o/20131120_122744.jpg

v_esta
11-04-14, 23:04
Woah, since when our side got jetty? :p

Good house
11-04-14, 23:12
Woah, since when our side got jetty? :p

Wah, eagle eyes :)

ilgr
12-04-14, 14:35
guys, some of you may be aware of the problems vacanza@east is facing, since the developer and contractors are the same.

i know someone from hoi hup who told me for sea esta, they will ensure the screed is cured, add an additional layer of moisture barrier before laying the timber flooring, and then apply bona wax to the surface as additional protection.

cant wait for dec TOP!

ilgr
12-04-14, 14:41
Woah, since when our side got jetty? :p

the jetty is near the spot where the hotel will be. and you see the small boats all.. maybe they place it there with the intention of revamping the beach.

acosean
12-04-14, 14:44
Wow, our Big Four seems minute on this plan!

v_esta
12-04-14, 15:44
guys, some of you may be aware of the problems vacanza@east is facing, since the developer and contractors are the same.

i know someone from hoi hup who told me for sea esta, they will ensure the screed is cured, add an additional layer of moisture barrier before laying the timber flooring, and then apply bona wax to the surface as additional protection.

cant wait for dec TOP!

Huh? Where you heard that it's going to TOP in Dec ah?
:scared-4:

ilgr
12-04-14, 18:05
Huh? Where you heard that it's going to TOP in Dec ah?
:scared-4:

A couple of forummers talked about it in the earlier posts.

mamamee88
12-04-14, 18:44
A couple of forummers talked about it in the earlier posts.

Thought TOP in Dec in earlier posts by some forummers was referring to Watercolours.

If Sea Esta also can TOP in Dec 2014, it will be great! ;)

ilgr
12-04-14, 19:03
Thought TOP in Dec in earlier posts by some forummers was referring to Watercolours.

If Sea Esta also can TOP in Dec 2014, it will be great! ;)

judging from the construction progress, possible to TOP dec if the rainy season isn't bad

CondoWE
12-04-14, 20:42
judging from the construction progress, possible to TOP dec if the rainy season isn't bad

Don't make me happy leh...:cheers6:! Btw, since you know someone in Hoi Hup, maybe can help us ask him/her when is the possible early date of TOP la :jump-for-joy:.

Good house
12-04-14, 23:18
the jetty is near the spot where the hotel will be. and you see the small boats all.. maybe they place it there with the intention of revamping the beach.

Currently this spot has tiny island where it disappear during high tide and re surface during low tide.

Good house
12-04-14, 23:21
Wow, our Big Four seems minute on this plan!



But hor the wooden stick they used to represent the Big Four is relatively bigger than other surrounding building leh.

Bro, URA have a number of big " play Mobil' in their gallery, must go and see, it is FOC now, next time they may start charging :)

Sea Esta
12-04-14, 23:34
12th April 2014 Construction Progress

12th April 2014 - Close Up - Level 8 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 12 of Block 26, Level 13 of Block 28 and Level 3 of Blk 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-frc1/t1.0-9/10155390_499364973503503_1120870926088961608_n.jpg

12th April 2014 - Panoramic View.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-ash3/t1.0-9/1939638_499365083503492_8689838240241305653_n.jpg

12th April 2014 - Sea Esta from Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t1.0-9/10153208_499365173503483_6915607532160020095_n.jpg

12th April 2014 - Blk 18 is at Level 8. Level 9 in progress.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10168069_499365323503468_5494486399954215678_n.jpg

12th April 2014 - Blk 18 is at Level 8. (Alternate View) Level 9 in progress.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-prn1/t1.0-9/1606999_499365470170120_186291697830187618_n.jpg

12th April 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10003911_499365596836774_3504165643145782326_n.jpg

12th April 2014 - Blk 20 is at Roof Level. (Pool Side)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10255612_499365716836762_4685241706240939657_n.jpg

12th April 2014 - Blk 22 is at Roof Level.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/10001507_499365836836750_2294153800486153839_n.jpg

12th April 2014 - Blk 26 is at Level 12. Level 13 in progress.
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/1653679_499365950170072_477370208023150384_n.jpg

12th April 2014 - Blk 28 is at Level 13. Roof Level in progress.
https://scontent-a.xx.fbcdn.net/hphotos-prn1/t1.0-9/10252117_499366086836725_1367476774097201485_n.jpg

12th April 2014 - Blk 30 is at Level 3. Level 4 in progress.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/10009858_499366340170033_1599069887352781513_n.jpg

12th April 2014 - Blk 30 is at Level 3. (Alternate View) Level 4 in progress.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10245568_499366486836685_464017036950702686_n.jpg

12th April 2014 - The bin centre and substation.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/1530300_499366583503342_6792783465968989794_n.jpg

12th April 2014 - Another banner.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10155002_499366696836664_6909570789728172639_n.jpg

CondoWE
13-04-14, 13:43
Wow...Sea Esta construction is progressing at a rapid rate sia :scared-4:!

Thanks bro Sea Esta for the update and pictures :cheers4:.

Sea Esta
13-04-14, 13:57
Wow...Sea Esta construction is progressing at a rapid rate sia :scared-4:!

Thanks bro Sea Esta for the update and pictures :cheers4:.

You are welcome.

Yes, blk 18 and 30 are now on steroid. Going up faster n faster.

acosean
13-04-14, 20:42
Goodhouse bro, surely I will find time to visit it with my family!

CondoWE
13-04-14, 20:59
You are welcome.

Yes, blk 18 and 30 are now on steroid. Going up faster n faster.

Double the dose please.....:D :D :D!

v_esta
13-04-14, 21:38
You are welcome.

Yes, blk 18 and 30 are now on steroid. Going up faster n faster.

Yes! Finally! Been waiting for my block to be up since ages ago! Haha!

Triple the dose please! :D

radha08
13-04-14, 21:54
looking good:cheers1::cheers1::cheers1:

v_esta
21-04-14, 14:31
It's raining again.... hope everything is smooth at Sea Esta...

Sea Esta bro.... would you be opening up your Facebook page as a community in the future?

Hope to be in a Sea Esta facebook community member... :D

Sea Esta
22-04-14, 00:27
It's raining again.... hope everything is smooth at Sea Esta...

Sea Esta bro.... would you be opening up your Facebook page as a community in the future?

Hope to be in a Sea Esta facebook community member... :D

Will do that soon. :D
Watch out for it. :)

CondoWE
22-04-14, 12:00
Will do that soon. :D
Watch out for it. :)

This week no pictures :jump-for-joy:?

Sea Esta
22-04-14, 22:03
This week no pictures :jump-for-joy:?

I do the picture update once every three weeks else the progress is too small to notice. :)

CondoWE
22-04-14, 23:09
I do the picture update once every three weeks else the progress is too small to notice. :)

Noted with thanks :jump-for-joy: !

Kukubird
28-04-14, 12:46
Ermmm..... got people asking $1300 - $1400 psf

http://www.propertyguru.com.sg/project/sea-esta-21257

I wondered if my 4th flr pool view can sell at this price?

DMCK
28-04-14, 13:17
Ermmm..... got people asking $1300 - $1400 psf

http://www.propertyguru.com.sg/project/sea-esta-21257

I wondered if my 4th flr pool view can sell at this price?

unless there is a naked woman swimming daily

kskong2000
28-04-14, 20:47
unless there is a naked woman swimming daily

Ha like what you say...

Kukubird
29-04-14, 11:02
Anybody got any news on the masterplan for Pasir Ris.
I heard they are going to build a MRT station somewhere near our vicinity.
No confirmation as of now :beats-me-man:

acosean
29-04-14, 12:37
May I know your source of hearing the hearsay? If we can trace it to the source, then we will be able to strike gold!

Kukubird
30-04-14, 14:42
May I know your source of hearing the hearsay? If we can trace it to the source, then we will be able to strike gold!http://www.straitstimes.com/breaking-news/singapore/story/more-new-mrt-lines-be-built-2030-20130117

acosean
30-04-14, 15:32
Oh no, this news was announced last year. I thought there are new developments lately but apparently there aren't.

radha08
30-04-14, 20:17
tommorow is a day for all the LABOURERS that are building sea esta

happy labour day:cheers1::D

CondoWE
01-05-14, 13:16
tommorow is a day for all the LABOURERS that are building sea esta

happy labour day:cheers1::D

Ya ya..they have a good rest today and triple the speed from tomorrow onwards....:D:D:D!

radha08
01-05-14, 14:20
Ya ya..they have a good rest today and triple the speed from tomorrow onwards....:D:D:D!


:cheers1::cheers1::cheers1::cheers1::cheers1::D:D:D:D:D:D:D

Sea Esta
03-05-14, 23:47
Construction Progress - 3rd May 2014

3rd May 2014 - Close Up - Level 10 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 13 of Block 26, Roof Level of Block 28 and Level 5 of Blk 30 completed.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/10261993_507583809348286_4719908376055770687_n.jpg

3rd May 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t1.0-9/10297662_507583979348269_4824403704469713320_n.jpg

3rd May 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/10176050_507584129348254_862500521095389201_n.jpg

3rd May 2014 - Blk 18 is at Level 10.
https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/1621783_507584346014899_4955511939611974717_n.jpg

3rd May 2014 - Blk 18 is at Level 10. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10297628_507584582681542_5624699496056871966_n.jpg

3rd May 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-frc3/t1.0-9/10153840_507584749348192_8721899590302692776_n.jpg

3rd May 2014 - Blk 20 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-frc1/t1.0-9/998498_507585052681495_1270606103814429456_n.jpg

3rd May 2014 - Blk 22 is at Roof Level.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10269559_507585379348129_2711145210845064552_n.jpg

3rd May 2014 - Blk 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t1.0-9/10345779_507585522681448_7320257124261139397_n.jpg

3rd May 2014 - Blk 26 is at Level 13.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10294239_507585729348094_3106416342973859379_n.jpg

3rd May 2014 - Blk 28 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-frc3/t1.0-9/10253970_507585912681409_8861581109580751290_n.jpg

3rd May 2014 - Blk 28 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10322687_507586182681382_234025969428251233_n.jpg

3rd May 2014 - Blk 30 is at Level 5.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/10312365_507586599348007_7596434360769370536_n.jpg

3rd May 2014 - Blk 30 is at Level 5. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10268607_507586892681311_1990009618688031201_n.jpg

3rd May 2014 - The bin centre and substation completed.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10304445_507587156014618_3872589691848348891_n.jpg

3rd May 2014 - The bin centre and substation completed. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-prn1/t1.0-9/1959394_507587412681259_741603450531651193_n.jpg

v_esta
04-05-14, 12:31
Wow.... I must say... all those completed and already painted blocks are b..e...a...u...t...i...f...u...l!!!

:D:D

Yuki
04-05-14, 12:50
Wow.... I must say... all those completed and already painted blocks are b..e...a...u...t...i...f...u...l!!!

:D:D
Yes agree impressive..

CondoWE
04-05-14, 15:58
Construction Progress - 3rd May 2014

3rd May 2014 - Close Up - Level 10 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 13 of Block 26, Roof Level of Block 28 and Level 5 of Blk 30 completed.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/10261993_507583809348286_4719908376055770687_n.jpg

3rd May 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-ash3/t1.0-9/10297662_507583979348269_4824403704469713320_n.jpg

3rd May 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-frc3/t1.0-9/10176050_507584129348254_862500521095389201_n.jpg

3rd May 2014 - Blk 18 is at Level 10.
https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/1621783_507584346014899_4955511939611974717_n.jpg

3rd May 2014 - Blk 18 is at Level 10. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10297628_507584582681542_5624699496056871966_n.jpg

3rd May 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-frc3/t1.0-9/10153840_507584749348192_8721899590302692776_n.jpg

3rd May 2014 - Blk 20 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-frc1/t1.0-9/998498_507585052681495_1270606103814429456_n.jpg

3rd May 2014 - Blk 22 is at Roof Level.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10269559_507585379348129_2711145210845064552_n.jpg

3rd May 2014 - Blk 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-prn2/t1.0-9/10345779_507585522681448_7320257124261139397_n.jpg

3rd May 2014 - Blk 26 is at Level 13.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10294239_507585729348094_3106416342973859379_n.jpg

3rd May 2014 - Blk 28 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-frc3/t1.0-9/10253970_507585912681409_8861581109580751290_n.jpg

3rd May 2014 - Blk 28 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10322687_507586182681382_234025969428251233_n.jpg

3rd May 2014 - Blk 30 is at Level 5.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-prn2/t1.0-9/10312365_507586599348007_7596434360769370536_n.jpg

3rd May 2014 - Blk 30 is at Level 5. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t1.0-9/10268607_507586892681311_1990009618688031201_n.jpg

3rd May 2014 - The bin centre and substation completed.
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t1.0-9/10304445_507587156014618_3872589691848348891_n.jpg

3rd May 2014 - The bin centre and substation completed. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-prn1/t1.0-9/1959394_507587412681259_741603450531651193_n.jpg

From your past till current update, it seem like they build 3-5 levels every 3 to 4 wks. If they maintain this constant speed, I believe it's quite possible to complete the construction for all blocks by Oct this year or maybe earlier leh :scared-4:!

v_esta
04-05-14, 23:00
But got landscaping and other exterior works leh..... ?

CondoWE
05-05-14, 09:22
But got landscaping and other exterior works leh..... ?

The most tedious and time consume one is building the blocks so Once all blocks completed, the rest will be easier liao :D !

Yuki
05-05-14, 09:28
hi...can share roughly when the foundation start for this project? and when the 2nd payment comes in?

This project seems very fast top!

CondoWE
05-05-14, 16:42
hi...can share roughly when the foundation start for this project? and when the 2nd payment comes in?

This project seems very fast top!

You may find your answer in bro Sea Esta's facebook (https://www.facebook.com/Sea.Esta.Condo)link. Regards to 2nd payment.....can't remember liao as mine already 45% paid to developer :rolleyes:.

v_esta
06-05-14, 17:04
...Regards to 2nd payment.....can't remember liao as mine already 45% paid to developer :rolleyes:.

Cos they built yours like a bullet train mah! :D

Myeast
10-05-14, 22:52
Cross by Sea Esta this morning and saw they are building up the club house, Wooh sooo fast.... Will this project be able to top earlier?? :rolleyes:

CondoWE
11-05-14, 10:45
Cross by Sea Esta this morning and saw they are building up the club house, Wooh sooo fast.... Will this project be able to top earlier?? :rolleyes:

TOP 6 months earlier should not have any problem but many are looking for 1 year or more earlier......:D:D:D!

radha08
11-05-14, 20:03
TOP 6 months earlier should not have any problem but many are looking for 1 year or more earlier......:D:D:D!

:cheers1::cheers1::cheers1:

Tktotts
11-05-14, 23:00
Hi, anybody here has a unit in stack 5? What is the payment as from now? Tks

Sea Esta
26-05-14, 03:23
Construction Progress - 25th May 2014


25th May 2014 - Close Up - Level 11 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Level 13 of Block 26, Roof Level of Block 28 and Level 7 of Blk 30 completed.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-frc3/t31.0-8/10275567_516218208484846_1875152348280904068_o.jpg

25th May 2014 - Panoramic View.
https://scontent-b.xx.fbcdn.net/hphotos-ash3/t31.0-8/10265525_516218458484821_4864465875309709776_o.jpg

25th May 2014 - Sea Esta from Pasir Ris Link.
https://scontent-b.xx.fbcdn.net/hphotos-frc3/t31.0-8/10273199_516218558484811_4800593978226162012_o.jpg

25th May 2014 - Blk 18 is at Level 11.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t31.0-8/10333456_516218651818135_2785222949848700883_o.jpg

25th May 2014 - Blk 20 is at Roof Level.
https://scontent-a.xx.fbcdn.net/hphotos-prn1/t31.0-8/10265525_516218791818121_5811082903238461246_o.jpg

25th May 2014 - Blk 20 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-frc3/t31.0-8/10284512_516218908484776_3933249601233573673_o.jpg

25th May 2014 - Blk 22 is at Roof Level.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-frc3/t31.0-8/10357684_516219038484763_7769612783922403596_o.jpg

25th May 2014 - Blk 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-prn1/t31.0-8/906273_516219108484756_508437563653100746_o.jpg

25th May 2014 - Blk 26 is at Level 13.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t31.0-8/10338468_516219245151409_398161156393008573_o.jpg

25th May 2014 - Blk 28 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-prn2/t31.0-8/1956751_516219321818068_3139941501259610120_o.jpg

25th May 2014 - Blk 30 is at Level 7.
https://scontent-a.xx.fbcdn.net/hphotos-frc1/t31.0-8/906263_516219441818056_1350734610781977697_o.jpg

25th May 2014 - Blk 30 is at Level 7. (Alternate View)
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-prn2/t31.0-8/1974296_516219498484717_7912384337149839104_o.jpg

yl
26-05-14, 08:52
Awesome view! Btw the units facing the sea...are they west facing?

v_esta
26-05-14, 09:15
OMG!

I wanna move in now!

:D:D:D

v_esta
26-05-14, 09:18
Awesome view! Btw the units facing the sea...are they west facing?

I think it's facing NNW.

Why leh?

CondoWE
26-05-14, 09:20
Very close to my estimation, 3~4 levels every 3 weeks :D.

If the construction maintain constantly with this speed, I think all blocks will be up by Aug/Sep...and hopefully by then they can have full force working on the swimming pools, tracks, fencing, carparks, badminton court.....etc :cheers5:!

yl
26-05-14, 14:04
I think it's facing NNW.

Why leh?

Oic..I was thinking views are awesome but i cant tell the facing from the photos...so just asked. :)

radha08
26-05-14, 21:45
Very close to my estimation, 3~4 levels every 3 weeks :D.

If the construction maintain constantly with this speed, I think all blocks will be up by Aug/Sep...and hopefully by then they can have full force working on the swimming pools, tracks, fencing, carparks, badminton court.....etc :cheers5:!


lets all join in to speed up construction:D:D:D...i think work as a construction worker one day..i take 1 week mc after that:D:D:D

radha08
26-05-14, 21:47
bros just a question now that the rental market is weakening fast how do you guys think rental demand for sea esta will be like...3 bedder...can get $3k??...just curious what are your views..;)

v_esta
01-06-14, 00:06
My take is that many owners spoilt market... panic lowering their rental price. :banghead:

I personally feel that the demand is still there one...

CondoWE
01-06-14, 10:40
bros just a question now that the rental market is weakening fast how do you guys think rental demand for sea esta will be like...3 bedder...can get $3k??...just curious what are your views..;)

Hi bro,

No need to panic la. My 3 bedder condo at west just rented out at 3.8K last month so I think 3.3-3.5K for Sea Esta should not be a problem :rolleyes:!

Strata
01-06-14, 11:57
Hi bro,

No need to panic la. My 3 bedder condo at west just rented out at 3.8K last month so I think 3.3-3.5K for Sea Esta should not be a problem :rolleyes:!

You can check the rental rate at nearby projects...For 3 bedders, less than 3.5k only. My 4br hdb can rent 2.5k. Actually hdb rental is much better nowadays.

CondoWE
01-06-14, 12:42
You can check the rental rate at nearby projects...For 3 bedders, less than 3.5k only. My 4br hdb can rent 2.5k. Actually hdb rental is much better nowadays.

That why I said 3.3-3.5K mah....:rolleyes:! If condo rental drop to 3K, I am pretty sure HDB will also drop, my guess is less than 2.2K :scared-3:!

btw, my neighbour rent out his 4 rooms to an angmo FT @ 2.7K.

Strata
01-06-14, 16:21
That why I said 3.3-3.5K mah....:rolleyes:! If condo rental drop to 3K, I am pretty sure HDB will also drop, my guess is less than 2.2K :scared-3:!

btw, my neighbour rent out his 4 rooms to an angmo FT @ 2.7K.

Depending on luck sometimes..nowadays tenants got more bargaining power..so many ppl want to rent out their flats..huge competition...that's way it is quite scary for pasir ris projects..suddenly huge supply come in and really worried whether demand is there..if supply more than demand...good luck for those investors...drop pants also need to rent out or no choice for own stay lor....

radha08
01-06-14, 22:36
actually i just asking cos now quite happy staying back in my hdb so maybe might think to rent out sea esta..if the rental is a lot different from renting my hdb 4rm flat...anyway this only my thought my other 50% owner:D:D:D..maybe got different idea:banghead::sleep:

radha08
01-06-14, 22:39
Depending on luck sometimes..nowadays tenants got more bargaining power..so many ppl want to rent out their flats..huge competition...that's way it is quite scary for pasir ris projects..suddenly huge supply come in and really worried whether demand is there..if supply more than demand...good luck for those investors...drop pants also need to rent out or no choice for own stay lor....

thats what i also thinking but then pasir ris got this coming up...

http://www.ura.gov.sg/uol/perspectives/home/pr-ofs.aspx

:cheers1::cheers1::cheers1:

v_esta
03-06-14, 14:47
btw, my neighbour rent out his 4 rooms to an angmo FT @ 2.7K.

4 rooms HDB?

v_esta
03-06-14, 15:09
thats what i also thinking but then pasir ris got this coming up...

http://www.ura.gov.sg/uol/perspectives/home/pr-ofs.aspx

:cheers1::cheers1::cheers1:

I think $$ is not the main consideration for some tenants.

If your place is accessible, cosy, has a nice warm feel, I believe the demand is there (though maybe lesser). If you are renting to couples or family, they usually look for cosy home feel. If you are renting to a group of FT, probably they just want a roof (in this case, $$ does matter).

So eventually, the target market is different.

Thermofisher
03-06-14, 15:13
With many many condos springing up in pasir ris like no tomorrow no amount of international school will make the rental market there competitive...to make matter worst....if we insist more developments good...it also implies congestion and rowdy environment in pasir ris....chicken and egg now.

Strata
03-06-14, 20:50
I would think Pasir Ris really need good size industrial and commercial projects to drive the demand. I notice along the Pasir Ris Farmway areas could be further develop into a business hub..the land area is huge there and it seem like Master Plan 2013 did have some indications...

radha08
04-06-14, 01:18
With many many condos springing up in pasir ris like no tomorrow no amount of international school will make the rental market there competitive...to make matter worst....if we insist more developments good...it also implies congestion and rowdy environment in pasir ris....chicken and egg now.

good point lets wait and see the truth will be revealed in about one to two years time...;)

radha08
04-06-14, 01:20
4 rooms HDB?

yes 4rm HDB;)

Thermofisher
04-06-14, 09:29
good point lets wait and see the truth will be revealed in about one to two years time...;)

In 2 years time 2016...cost will be even stablise...else our PM Lee will be panicking! The congestion and over crowding situation in Pasir Ris is not something Teo Chee Hean or PM Lee able to solve. If they could solve we will not have housing price escalation issue! No offence but it is just too urbanized like concrete jungle in east and north east. Sengkang and Punggol has the worst concrete empire there!

radha08
04-06-14, 22:45
In 2 years time 2016...cost will be even stablise...else our PM Lee will be panicking! The congestion and over crowding situation in Pasir Ris is not something Teo Chee Hean or PM Lee able to solve. If they could solve we will not have housing price escalation issue! No offence but it is just too urbanized like concrete jungle in east and north east. Sengkang and Punggol has the worst concrete empire there!

actually whole singapore is crowded...i dont see any new town that is not crowded its just that some are more crowded than others...:o

v_esta
04-06-14, 22:56
Yup... everywhere else is springing up either condo or flats... see even small neighbourhood like Simei?

DMCK
05-06-14, 09:59
there are motive why the gov build so many flats and let developers too

CondoWE
06-06-14, 10:59
4 rooms HDB?

Yes. At Jurong West, high level.

Sunnielee
06-06-14, 17:30
Has anyone noticed that our main contractor-Straits Construction's official website no more exist?:confused:

CondoWE
06-06-14, 19:39
Has anyone noticed that our main contractor-Straits Construction's official website no more exist?:confused:

I think they are revamping their website (http://www.straitsconstruction.com/).

v_esta
07-06-14, 11:36
Yes. At Jurong West, high level.

Then that's quite ok.... right?

radha08
07-06-14, 20:25
I think they are revamping their website (http://www.straitsconstruction.com/).

or maybe got too many construction complain website crash:simmering::scared-4::scared-5:

Sunnielee
10-06-14, 09:20
or maybe got too many construction complain website crash:simmering::scared-4::scared-5:

They used to put the expected completed date in the website (May 2015) but now cannot trace the update

CondoWE
17-06-14, 10:33
Level 12 of Block 18, Roof Level of Block 26, and Level 8 of Blk 30 completed :rolleyes:?

Sea Esta
17-06-14, 21:59
Construction Progress on 15th June 2014

15th June 2014 - Close Up - Level 12 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Roof Level of Block 26, Roof Level of Block 28 and Level 8 of Block 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10438169_525718137534853_8227530579597500759_n.jpg

15th June 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10392334_525718330868167_7521600277956610776_n.jpg

15th June 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10487396_525718430868157_8052222980245331358_n.jpg

15th June 2014 - Blk 18 is at Level 12.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10385572_525718720868128_6204016484283095019_n.jpg

15th June 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10440821_525718927534774_5012834212756278482_n.jpg

15th June 2014 - Blk 20 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10429417_525719044201429_3247062142468302937_n.jpg

15th June 2014 - Blk 22 is at Roof Level.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10447654_525719227534744_5922265401275780670_n.jpg

15th June 2014 - Blk 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-xfp1/t1.0-9/10377993_525719457534721_6270875690911336487_n.jpg

15th June 2014 - Blk 26 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10419475_525719587534708_972722527507335826_n.jpg

15th June 2014 - Blk 28 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10446698_525719847534682_7276031554522479308_n.jpg

15th June 2014 - Blk 30 is at Level 8.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10491205_525720067534660_2701395107058610401_n.jpg

15th June 2014 - Blk 30 is at Level 8. (Alternate View)
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10303807_525720327534634_6719586069396435677_n.jpg

15th June 2014 - Blk 24, the club house, is in progress.
https://scontent-a.xx.fbcdn.net/hphotos-xfa1/t1.0-9/10460725_525720467534620_18818528969481782_n.jpg

15th June 2014 - A new road sign along Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-xap1/t1.0-9/10472735_525720777534589_2993918639546160784_n.jpg

v_esta
18-06-14, 10:21
Yippee!!

Finally at level 8.
Still think the painted ones are looking great! :D

CondoWE
18-06-14, 16:55
Yippee!!

Finally at level 8.
Still think the painted ones are looking great! :D

Block 22 has grey bottom and white top so will it be grey and white theme :cheers1:?

CondoWE
18-06-14, 17:01
Construction Progress on 15th June 2014

15th June 2014 - Close Up - Level 12 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Roof Level of Block 26, Roof Level of Block 28 and Level 8 of Block 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10438169_525718137534853_8227530579597500759_n.jpg

15th June 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10392334_525718330868167_7521600277956610776_n.jpg

15th June 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10487396_525718430868157_8052222980245331358_n.jpg

15th June 2014 - Blk 18 is at Level 12.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10385572_525718720868128_6204016484283095019_n.jpg

15th June 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10440821_525718927534774_5012834212756278482_n.jpg

15th June 2014 - Blk 20 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10429417_525719044201429_3247062142468302937_n.jpg

15th June 2014 - Blk 22 is at Roof Level.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10447654_525719227534744_5922265401275780670_n.jpg

15th June 2014 - Blk 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-xfp1/t1.0-9/10377993_525719457534721_6270875690911336487_n.jpg

15th June 2014 - Blk 26 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10419475_525719587534708_972722527507335826_n.jpg

15th June 2014 - Blk 28 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10446698_525719847534682_7276031554522479308_n.jpg

15th June 2014 - Blk 30 is at Level 8.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10491205_525720067534660_2701395107058610401_n.jpg

15th June 2014 - Blk 30 is at Level 8. (Alternate View)
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10303807_525720327534634_6719586069396435677_n.jpg

15th June 2014 - Blk 24, the club house, is in progress.
https://scontent-a.xx.fbcdn.net/hphotos-xfa1/t1.0-9/10460725_525720467534620_18818528969481782_n.jpg

15th June 2014 - A new road sign along Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-xap1/t1.0-9/10472735_525720777534589_2993918639546160784_n.jpg

Close to my estimation. If everything go smoothly, chance of TOP by end of Jan 2015 is very high.....:scared-4::scared-4::scared-4:!

CondoWE
18-06-14, 17:03
Construction Progress on 15th June 2014

15th June 2014 - Close Up - Level 12 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Roof Level of Block 26, Roof Level of Block 28 and Level 8 of Block 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10438169_525718137534853_8227530579597500759_n.jpg

15th June 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10392334_525718330868167_7521600277956610776_n.jpg

15th June 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10487396_525718430868157_8052222980245331358_n.jpg

15th June 2014 - Blk 18 is at Level 12.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10385572_525718720868128_6204016484283095019_n.jpg

15th June 2014 - Blk 20 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10440821_525718927534774_5012834212756278482_n.jpg

15th June 2014 - Blk 20 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10429417_525719044201429_3247062142468302937_n.jpg

15th June 2014 - Blk 22 is at Roof Level.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10447654_525719227534744_5922265401275780670_n.jpg

15th June 2014 - Blk 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-xfp1/t1.0-9/10377993_525719457534721_6270875690911336487_n.jpg

15th June 2014 - Blk 26 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10419475_525719587534708_972722527507335826_n.jpg

15th June 2014 - Blk 28 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10446698_525719847534682_7276031554522479308_n.jpg

15th June 2014 - Blk 30 is at Level 8.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10491205_525720067534660_2701395107058610401_n.jpg

15th June 2014 - Blk 30 is at Level 8. (Alternate View)
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10303807_525720327534634_6719586069396435677_n.jpg

15th June 2014 - Blk 24, the club house, is in progress.
https://scontent-a.xx.fbcdn.net/hphotos-xfa1/t1.0-9/10460725_525720467534620_18818528969481782_n.jpg

15th June 2014 - A new road sign along Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-xap1/t1.0-9/10472735_525720777534589_2993918639546160784_n.jpg

Close to my estimation :D. If everything go smoothly, chance of getting TOP by end of Jan 2015 looks promising sia.....:scared-4::scared-4::scared-4:!

v_esta
18-06-14, 21:24
I can tell you are excited too! Haha

CondoWE
18-06-14, 21:38
I can tell you are excited too! Haha

Not just me...all Sea Esta-ers should be excited too..:D:D:D!

v_esta
21-06-14, 08:31
I looked back at the showroom photos and confirm that there shouldn't be different colors for bottom and top levels. :confused: :confused:

Didn't notice the brown color until you pointed out, CondoWE.

CondoWE
01-07-14, 08:15
Finally, the forum is up. So bore without it...lol!

v_esta
01-07-14, 21:22
Finally, the forum is up. So bore without it...lol!

Same! Thought what happened! :eek:

CondoWE
03-07-14, 10:21
This weekend is the 3rd week from last construction progress update so look forward to more new update from bro Sea Esta :cheers6:.

My guess is all blocks should be completed except block 30 at level 10 nia :D !

v_esta
03-07-14, 22:43
I doubt Blk 30 is at level 10.... a bit too fast right? :scared-4:

CondoWE
04-07-14, 06:02
I doubt Blk 30 is at level 10.... a bit too fast right? :scared-4:

Hi bro,

Previous construction progress updated by bro Sea Esta was all blocks completed except block 18 @ level 12 completed and Block 30 @ level 8 completed.

From my observation, it seem like they build 3-4 levels every 3 weeks. So I guessed this week is +1 for block 18 and +2 for Block 30 lor. It's just my "guesstimation" so I might be wrong too...:rolleyes:!

mamamee88
05-07-14, 23:03
Hi bro,

Previous construction progress updated by bro Sea Esta was all blocks completed except block 18 @ level 12 completed and Block 30 @ level 8 completed.

From my observation, it seem like they build 3-4 levels every 3 weeks. So I guessed this week is +1 for block 18 and +2 for Block 30 lor. It's just my "guesstimation" so I might be wrong too...:rolleyes:!

Happen to pass by this afternoon with a quick glance, seem like blk 30 lvl 10 going to complete soon.

Sea Esta
06-07-14, 10:47
Construction Progress - 6th July 2014

6th July 2014 - Close Up - Level 12 of Block 18, Roof Level of Block 20, Roof Level of Block 22, Roof Level of Block 26, Roof Level of Block 28 and Level 10 of Block 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10525589_533315096775157_4680160070420510772_n.jpg

6th July 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-xaf1/t1.0-9/10487600_533315496775117_4465656960228400692_n.jpg

6th July 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10471378_533315560108444_5277813678433266877_n.jpg

6th July 2014 - Block 18 is at Level 12.
https://scontent-b.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10525837_533315710108429_7617017428894569132_n.jpg

6th July 2014 - Block 20 is at Roof Level.
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10457922_533315813441752_2368744735509869450_n.jpg

6th July 2014 - Block 20 is at Roof Level. (Alternate View)
https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10409415_533315900108410_397464981377411193_n.jpg

6th July 2014 - Block 22 is at Roof Level.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xfa1/t1.0-9/10526017_533316026775064_2807545051265344595_n.jpg

6th July 2014 - Block 22 is at Roof Level. (Alternate View)
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10505458_533316170108383_7308865078409355829_n.jpg

6th July 2014 - Block 26 is at Roof Level.
https://scontent-b.xx.fbcdn.net/hphotos-xap1/t1.0-9/10526124_533316330108367_5922612565862745_n.jpg

6th July 2014 - Block 28 is at Roof Level.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10463049_533316456775021_7485193400723078130_n.jpg

6th July June 2014 - Block 30 is at Level 10.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10405669_533316563441677_1061432827855748042_n.jpg

6th July June 2014 - Block 30 is at Level 10. (Alternate View)
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10517485_533316730108327_3799845776341694434_n.jpg

6th July June 2014 - Block 24, the club house, is almost completed.
https://scontent-a.xx.fbcdn.net/hphotos-xap1/t1.0-9/10471492_533316983441635_6133586329455158497_n.jpg

6th July June 2014 - Block 18 and 20 from Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-xfa1/t1.0-9/10338225_533317213441612_5929956937504383322_n.jpg

v_esta
06-07-14, 15:47
I just went to look at the progress too. And I am quite certain they have installed for us Mitsubishi compressor. Yay!

CondoWE
06-07-14, 17:10
I just went to look at the progress too. And I am quite certain they have installed for us Mitsubishi compressor. Yay!
Mitsubishi is good in term of energy saving and it's silent too.

Good house
06-07-14, 23:00
Mitsubishi is good in term of energy saving and it's silent too.


Yes, I installed this inverter unit in my current home eight years ago. The energy saving is amazing, straight away see result the following mth.
Three years saving take back the cost Liao. Easy to do self cleaning too.
Aircon serving people sure not like this unit one:cheers1:

Sea Esta
26-07-14, 05:01
The forum is up finally. Just in time for the update this weekend. :D

CondoWE
26-07-14, 07:45
The forum is up finally. Just in time for the update this weekend. :D

haha...waiting for your update..

CondoWE
26-07-14, 18:58
Hi guy,

Does anyone know the ceiling height for ground floor unit? Is it the same as 2nd and above floors unit?

Sea Esta
27-07-14, 01:13
Construction Progress @ 26th July 2014

26th July 2014 - Close Up - Roof Level of Block 18, Block 20, Block 22, Block 26 and Block 28 plus Level 12 of Block 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-xap1/v/t1.0-9/10481179_541314889308511_1492580952475946336_n.jpg?oh=5a892311b642246706fbceea8c0eefba&oe=543AFEC8

26th July 2014 - Panoramic View.
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xpa1/v/t1.0-9/10517592_541315112641822_118148420930947129_n.jpg?oh=70ae9740a7ff12d0e0964b060585027d&oe=54397C9E&__gda__=1414447267_928baa458542881daf96add1880b3eaa

26th July 2014 - Sea Esta from Pasir Ris Link.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/1620868_541315219308478_4972861755831905481_n.jpg

26th July 2014 - Block 18 is at Roof Level.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10518659_541315305975136_4186589793125833750_n.jpg

26th July 2014 - Block 18 is at Roof Level. (Alternate View)
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10502111_541315435975123_8435600513793484441_n.jpg

26th July 2014 - Block 20 is at Roof Level.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpf1/v/t1.0-9/10577033_541315585975108_7743466497157740560_n.jpg?oh=1df93e8ba38f09607f608deff0aec7ca&oe=5454A6F8&__gda__=1413532818_c86dba8586e93871c559c2aeebcf0eef

26th July 2014 - Block 20 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10524597_541315692641764_6799180740589751796_n.jpg

26th July 2014 - Block 22 is at Roof Level.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10556275_541315942641739_8500971966425727222_n.jpg

26th July 2014 - Block 22 is at Roof Level. (Alternate View)
https://scontent-a.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10562925_541316035975063_8469699904517716863_n.jpg

26th July 2014 - Block 26 is at Roof Level.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10509642_541316192641714_3449807481797747714_n.jpg

26th July 2014 - Block 28 is at Roof Level.
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10502456_541316382641695_3037329136215573326_n.jpg

26th July June 2014 - Block 30 is at Level 12.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10401873_541316559308344_5457449591532238498_n.jpg

26th July June 2014 - Block 30 is at Level 12. (Alternate View)
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10348386_541316712641662_7532609789487654337_n.jpg

26th July June 2014 - Block 24, the club house is completed.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/10547564_541316895974977_2692484870549210515_n.jpg

26th July June 2014 - Palm tree at the Sunset Pool with Jacuzzi Seats.
https://scontent-a.xx.fbcdn.net/hphotos-xpf1/v/t1.0-9/10488135_541317035974963_3258702739827906832_n.jpg?oh=d5eaf8e872917104bd15a8137161ee55&oe=543A187B

26th July June 2014 - Palm tree at the Sunset Pool with Jacuzzi Seats. (Alternate View)
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10378132_541317182641615_8636913882166959339_n.jpg

26th July June 2014 - Anti rust coating applied followed by the final silver paint.
https://fbcdn-sphotos-e-a.akamaihd.net/hphotos-ak-xaf1/t1.0-9/1920451_541317425974924_7885039572126461904_n.jpg

26th July June 2014 - Mitsubishi compressor units.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10458548_541317639308236_7113873769116224970_n.jpg

26th July June 2014 - Defect spotted at Block 28.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xpf1/v/t1.0-9/10544421_541317885974878_284128211397489769_n.jpg?oh=8a8c3127ba0ae97f3b65e3e92cf0971f&oe=5447641E&__gda__=1413185503_b94ece3cad2be9c90488094eb0aae4fe

26th July June 2014 - Road signs are up on Pasir Ris Link and Pasir Ris Rise. Both roads should be opening soon for the TOP of Seastrand.
https://scontent-b.xx.fbcdn.net/hphotos-xfp1/t1.0-9/10297868_541317982641535_6551675700607453928_n.jpg

1984
27-07-14, 16:46
Anyone bought in blk18?

Arcachon
27-07-14, 17:00
Anyone bought in blk18?

Why 1984 ? 1984 have a nice memory for me, it is when I join the Airforce.

081828
27-07-14, 18:38
Do you guys think Sea Esta will obtain TOP by end March 2015?

081828
27-07-14, 18:44
The construction progress seems to be going well... At this rate, possible to complete by this year end and obtain TOP by end March 2015?

CondoWE
27-07-14, 19:45
Why 1984 ? 1984 have a nice memory for me, it is when I join the Airforce.

It remind me that I'm old folk now..1984 was my ROD/ORD from army ...:o !



Do you guys think Sea Esta will obtain TOP by end March 2015?

haha...I'm hoping it to TOP by end Jan 2015 or earlier....;)!

v_esta
28-07-14, 00:26
Swee!!!

I'm hoping it TOP this year end so that we have ample time to reno it to welcome the CNY next year! ;)

radha08
29-07-14, 02:42
sigh sometimes i wonder why i never bought a completed condo...:confused:..the wait for a BUC is frustrating...plus the thought of how much
rental i foregone had i bought a resale and rented out over the past 2 years :(..dunno to be happy or sad...:confused:

CondoWE
29-07-14, 11:00
sigh sometimes i wonder why i never bought a completed condo...:confused:..the wait for a BUC is frustrating...plus the thought of how much
rental i foregone had i bought a resale and rented out over the past 2 years :(..dunno to be happy or sad...:confused:

IMHO, the instalment amount is different from completed condo compare to BUC and beside it, for own stay brand new BUC is better unless the unit is for rental...:D!

Btw, if too much of hard cash on hand (CASH Rich) then buy another completed unit to rental lor....lol!

radha08
31-07-14, 17:31
Why 1984 ? 1984 have a nice memory for me, it is when I join the Airforce.

i join in 1988;)

CondoWE
09-08-14, 10:42
Wish all Sea Esta'ers happy National day :o !

May all Wishes come true...includes TOP< end 2014...lol!

v_esta
09-08-14, 15:38
Happy national day!

Just a little sneak peek today!

CondoWE
09-08-14, 21:02
Happy national day!

Just a little sneak peek today!

Which block is it?

mamamee88
09-08-14, 21:43
Happy national day!

Just a little sneak peek today!


Which block is it?

Why this 2 blocks are so near?

v_esta
09-08-14, 22:31
Which block is it?

Block 30. The rest of the places have high metal barrier.

v_esta
09-08-14, 22:36
Why this 2 blocks are so near?

They appear to be near but these 2 blocks are not facing directly at each other.

1984
11-08-14, 21:02
Just drove by to take a look at night via Pasir Ris Link and Jln Loyang Besar. Some units in blocks 18 and 20 are lighted, can see that the unit is painted and they are doing some works in there.

Yuki
12-08-14, 18:01
How many are 1st time homeowners?

:)

CondoWE
16-08-14, 09:20
Hi Bro Sea Esta,

This wk is the 3rd wks from your last update so any significant progress now? All blocks' roof top and guard house completed? fencing up ?

Sea Esta
17-08-14, 09:30
Construction Progress - 16th August 2014

16th August 2014 - Close Up - Roof Level of Block 18, Block 20, Block 22, Block 26 and Block 28 plus Level 12 of Block 30 completed.
https://scontent-a.xx.fbcdn.net/hphotos-xfa1/t1.0-9/10612637_549661168473883_944981860535433049_n.jpg

16th August 2014 - Panoramic View.
https://scontent-a.xx.fbcdn.net/hphotos-xpf1/t1.0-9/10387499_549661251807208_2429484769270348083_n.jpg

16th August 2014 - Sea Esta from Pasir Ris Link.
https://scontent-a.xx.fbcdn.net/hphotos-xfp1/t1.0-9/10449532_549661335140533_6152774238172789489_n.jpg

16th August 2014 - Block 18 is at Roof Level.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xpf1/v/t1.0-9/10609545_549661458473854_3200657517605810902_n.jpg?oh=288186cb8d2ea61033d31314bd8b6f73&oe=547E14F7&__gda__=1417319325_b784449e5ead378ffc509dc195767bae

16th August 2014 - Block 18 is at Roof Level. (Alternate View)
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10536936_549661531807180_4401192933602361795_n.jpg

16th August 2014 - Block 20 is at Roof Level.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/1536629_549661591807174_8116470883998856765_n.jpg

16th August 2014 - Block 20 is at Roof Level. (Alternate View)
https://scontent-b.xx.fbcdn.net/hphotos-xfp1/t1.0-9/10553601_549661661807167_2923853606433434511_n.jpg

16th August 2014 - Block 22 is at Roof Level.
https://scontent-a.xx.fbcdn.net/hphotos-xfp1/t1.0-9/1610788_549661828473817_636741164014450512_n.jpg

16th August 2014 - Block 22 is at Roof Level. (Alternate View)
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xfa1/v/t1.0-9/10606046_549661891807144_1155167710407453586_n.jpg?oh=b0fddd3274ee9a03ef7c6c721a1abb26&oe=54720B4F&__gda__=1415250553_d4da018c7f3df42231292bbe603505db

16th August 2014 - Block 26 is at Roof Level.
https://fbcdn-sphotos-d-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10408553_549661998473800_3759328181697923951_n.jpg

16th August 2014 - Block 28 is at Roof Level.
https://fbcdn-sphotos-f-a.akamaihd.net/hphotos-ak-xfp1/v/t1.0-9/10473060_549662075140459_5359595038137010343_n.jpg?oh=bb7d3c536f84db197ee4074b98a1ddf9&oe=545F95A5&__gda__=1417811500_373cfe7c6ee34148c21ef8726e469fd9

16th August 2014 - Block 30 is at Level 12.
https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xfp1/t1.0-9/10616177_549662148473785_8843144139334878566_n.jpg

16th August 2014 - Block 30 is at Level 12. (Alternate View)
https://fbcdn-sphotos-b-a.akamaihd.net/hphotos-ak-xpa1/v/t1.0-9/10481690_549662268473773_8132826430883961963_n.jpg?oh=45eaf8ac60f8f0f99b3f80d0717440f5&oe=54782AD5&__gda__=1416962669_0181bb1f6e46a531bffa230aa54926d0

16th August 2014 - Block 24, the club house is completed.
https://fbcdn-sphotos-c-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/10570495_549662338473766_8080991947172155114_n.jpg

16th August 2014 - Sea Esta from Ripple Bay's Construction Site Main Gate.
https://scontent-a.xx.fbcdn.net/hphotos-xpa1/v/t1.0-9/10514529_549662485140418_2797333872126672772_n.jpg?oh=770df26a22c34b0ee80aa24f0d4b7f9e&oe=5480B01D

16th August 2014 - Sea Esta from Ripple Bay's Construction Site 2nd Gate.
https://fbcdn-sphotos-g-a.akamaihd.net/hphotos-ak-xap1/t1.0-9/10491975_549662548473745_2895561297212749113_n.jpg

16th August 2014 - Pasir Ris Link Lane Marking is completed.
https://fbcdn-sphotos-a-a.akamaihd.net/hphotos-ak-xpa1/t1.0-9/1535527_549662655140401_3396062321161578417_n.jpg

Sea Esta
17-08-14, 09:31
Hi Bro Sea Esta,

This wk is the 3rd wks from your last update so any significant progress now? All blocks' roof top and guard house completed? fencing up ?

Unfortunately, Block 30 is not completed aka at roof level yet.

Guard house not found

Fence got. Still construction fencing.

:D

CondoWE
17-08-14, 10:52
Unfortunately, Block 30 is not completed aka at roof level yet.

Guard house not found

Fence got. Still construction fencing.

:D

:grumpy: seem like not much different from 3 week ago :concern: !

Sea Esta
17-08-14, 13:40
:grumpy: seem like not much different from 3 week ago :concern: !

Ya lor. :concern:

DPan
17-08-14, 13:47
Ya lor. :concern:
Bro
think from now on cant see big difference le, all outer already reach roof.
now should be doing internal plastering, wiring ......etc

Sea Esta
17-08-14, 17:49
Bro
think from now on cant see big difference le, all outer already reach roof.
now should be doing internal plastering, wiring ......etc

Agreed with you, bro. Once Block 30 reached roof level, it will be interior stuff n exterior landscaping.

CondoWE
17-08-14, 18:24
If see fencing up....ho say liao..:biggrin-new: !

v_esta
17-08-14, 19:11
Wonder what kind of fencing we would be having?
Shouldn't be off too much from the model, right?

v_esta
17-08-14, 19:16
How many are 1st time homeowners?

:)

Not the first time! :adoration:

radha08
17-08-14, 21:37
wow just realised we are at page 290 of this thread...Not bad:eagerness:

also another piece of god news there is a big banner outside say it is a dengue GREEN area...few weeks ago was like in a RED zone with 80 cases:stung:

CondoWE
18-08-14, 10:00
Not the first time! :adoration:

Although not the first time but feeling of getting new house is always the same as the first time....:tongue4:!

v_esta
21-08-14, 22:45
wow just realised we are at page 290 of this thread...Not bad:eagerness:

also another piece of god news there is a big banner outside say it is a dengue GREEN area...few weeks ago was like in a RED zone with 80 cases:stung:

Yeay!
Great to hear that! :encouragement:

v_esta
21-08-14, 22:49
Although not the first time but feeling of getting new house is always the same as the first time....:tongue4:!

Indeed! The excitement is a great feeling. :biggrin-new:

Good house
04-09-14, 17:36
Sea Esta was beautiful, saw worker working on tbe pool at the corner and some plants too

Sat Han
05-09-14, 16:34
hi, there is no news from developer so far.

CondoWE
05-09-14, 17:09
hi, there is no news from developer so far.

Haha...what news are you expecting from developer :concern:?

Sat Han
06-09-14, 09:12
Haha...what news are you expecting from developer :concern:?

I just want to know when TOP will, so I can prepare to shift in advance. :lemo:

radha08
06-09-14, 22:01
my guess june 2015 top

v_esta
06-09-14, 23:26
Sea Esta was beautiful, saw worker working on tbe pool at the corner and some plants too

Woah. Good leh! But how you manage to see ah? I thought the corner pool quite deep in one and is blocked by Blk 30. :)

v_esta
06-09-14, 23:28
I just want to know when TOP will, so I can prepare to shift in advance. :lemo:

Yup! Me too! :D

CondoWE
07-09-14, 00:06
my guess june 2015 top

:cheers1:...my guess is Mar 2015 :hornybastard: !