If you look at the map of the NSE as visualized based on infor available, there is likelyhood that the TL could follow part of the path, the NSE is expected to be completed in 2020, 2 years after TL, which is logical time frame if its above TL.
http://www.skyscrapercity.com/showthread.php?p=65131475