哪《性》比较贴近。看来riveria是38的。Originally Posted by ayahiro
哪《性》比较贴近。看来riveria是38的。Originally Posted by ayahiro
Yee ha! Did I tickle your funny bone?
Anyone have lastest update on site or payment progess ?
Nothing yet.. think a bit slowed down now~ lol~Originally Posted by Noexit
Will go this weekend take some pic for sep .Originally Posted by ayahiro
Today went to the riviera 38 site . The progess of construction is very good .
Latest up date :
1) Construction for 2bedder have reach level 26
Construction for 1/1+1/2+1/3 bedder have reach level 25-70% completed
2) The window frame at level 6 to 15 - 90 % completed
3) The first coating of the paint for external wall at 2bedder have painted .
4) See some of the window glass have place at the ground of the site .
Photo will update later .
View from potong pasir. the view Riviera38 will be facing .
photo taken from potong pasir direction
Photo taken at site
Photo taken at site .
Photo taken at site
Thanks for the pics! Well taken
Thanks . U can look at the Facebook too for new updates
https://www.facebook.com/condominium....3?ref=tn_tnmn
I actually wanted to see how the swimming pool is like. Let hope and pray it doesn't look like our neighbour Vetro one!
Just wondering, will there be an extension out once complete? Take a look at the swimming pool size VS the current built up, the swimming pool should be directly outside of the empty area of the photo.
The progess for the project is good , any update of the payment progess form anyone ?
Lastest update :
Heard from my friend say he passby riviera all the scaffold from level 6 to 15 had been dismantle . I think they going to In store window frame soon . Yeah
copy image URL, then click on the yellow icon with mountain at the top.
Or use the img tag
http://www.dpchallenge.com/tutorial.php?TUTORIAL_ID=17