Page 21 of 58 FirstFirst ... 61116171819202122232425263136414651 ... LastLast
Results 601 to 630 of 1722

Thread: Riviera 38 - Allgreen - 26 storeys - 38 Mar Thoma Rd

  1. #601
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Start counting from the date you sign your OTP and after 4th year later, that mean on the beginning of your 5th year u can sell without any ASSD

    Quote Originally Posted by Areivir
    I purchase a unit at jun 2012...when can sell? 5 years from the date I signed the OPT?

  2. #602
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    I guess all project are like that for marketing and sales reason they always had to put nice pics to attach ppls end of the day, the buyers will still need to do homework to take a walk at that area they are buying look ard whether they can accept it or not

    Quote Originally Posted by ayahiro
    actually riviera also got problem...

    U see.. they put such a nice river beside the condo in the book... end up it is just a sewer... -.-

    their house in the book also shows no highway and nothing blocking... lol

  3. #603
    Join Date
    Feb 2013
    Posts
    30

    Default

    Quote Originally Posted by Estrangable
    got a shock when i saw the size of the swimming pool of the condo -vetro which is pretty near to R38. See attached on what is in the brochure and what was actually built....will it be the same for R38??? I pray not....

    Will allgreen throw such a "stunner" when R38 TOP?
    Lolz looks really small!!!

  4. #604
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by ayahiro
    actually riviera also got problem...

    U see.. they put such a nice river beside the condo in the book... end up it is just a sewer... -.-

    their house in the book also shows no highway and nothing blocking... lol
    We are referring to the building , the scenery all developer will not show the view beside all will put greenery trees to all project . No choice

  5. #605
    Join Date
    Oct 2012
    Posts
    144

    Default

    Just wondering if the condo developer will provide owner with the detailed floor plan (with the measurement of kitchen, bedroom, etc.) upon TOP (something like HDB floor plan).

  6. #606
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    I guess should have just like any other project for the normal handing/taking over proceduces

    Quote Originally Posted by angel.tan
    Just wondering if the condo developer will provide owner with the detailed floor plan (with the measurement of kitchen, bedroom, etc.) upon TOP (something like HDB floor plan).

  7. #607
    Join Date
    Feb 2013
    Posts
    30

    Default

    Good evening owners of Riviera38!

  8. #608
    Join Date
    Dec 2011
    Posts
    48

    Default

    [QUOTE=ghariwala]Good evening owners of Riviera38![/QUOT

    Morning !!

  9. #609
    Join Date
    Apr 2009
    Posts
    5,841

    Default

    that is heck of a long time to earn that little bit of money.
    Quote Originally Posted by Noexit
    Start counting from the date you sign your OTP and after 4th year later, that mean on the beginning of your 5th year u can sell without any ASSD

  10. #610
    Join Date
    Aug 2009
    Posts
    376

    Default

    Quote Originally Posted by angel.tan
    Just wondering if the condo developer will provide owner with the detailed floor plan (with the measurement of kitchen, bedroom, etc.) upon TOP (something like HDB floor plan).
    Yes, like the HDB plan drawings to the nearest .01 metres icluding other plan drawings like the layout of electrical (lightning), aircon, heating (hot water if any ) These are most basic items in your welcome package.

    I don't own RV38 but can see her growing taller from my PC across the road. It will look majestic at TOP time.
    Last edited by alamak; 16-03-13 at 09:56.

  11. #611
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by Estrangable
    its not the length i am worried about....its the "thickness"....
    This is mezzo swimming pool 30m by 6m . R38 will be similar like this . R38 is 33m by 6.4m Hehe

    http://www.flickr.com/photos/83477613@N08/8557042998/
    Last edited by Noexit; 16-03-13 at 11:14.

  12. #612
    Join Date
    Oct 2012
    Posts
    144

    Default

    Quote Originally Posted by alamak
    Yes, like the HDB plan drawings to the nearest .01 metres icluding other plan drawings like the layout of electrical (lightning), aircon, heating (hot water if any ) These are most basic items in your welcome package.

    I don't own RV38 but can see her growing taller from my PC across the road. It will look majestic at TOP time.
    Can you see Regent Residences from your place?

  13. #613
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by angel.tan
    Can you see Regent Residences from your place?
    Regent residence is not up yet so cannot . R38 is level 12 to 13?now .

  14. #614
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Any one go to the site build to which level now ? any update ?

  15. #615
    Join Date
    Oct 2012
    Posts
    144

    Default

    Quote Originally Posted by Noexit
    Any one go to the site build to which level now ? any update ?
    Passed along the expressway just now, and saw the yellow protruding box + 2 levels (not sure which level that is).

    Regent Residences' tower crane is up.

  16. #616
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by angel.tan
    Passed along the expressway just now, and saw the yellow protruding box + 2 levels (not sure which level that is).

    Regent Residences' tower crane is up.
    Thanks . Will take pic at April update in Facebook .

  17. #617
    Join Date
    Aug 2009
    Posts
    376

    Default

    Quote Originally Posted by angel.tan
    Can you see Regent Residences from your place?
    Regent residences is now at ground zero. Yes, from my vantage pt should see the tail portion of it (as front portion nearer to road is blocked by one st Michael).

  18. #618
    Join Date
    Oct 2011
    Posts
    1,668

    Default construction time for R38

    China (South Pacific) Development Co.Pte Ltd had tender this construction project from AllGreen for 29 months since 1 Sep 2011 and expected to complete by 1 March 2014. Something to share to all R38 owners.

  19. #619
    Join Date
    Jan 2013
    Posts
    162

    Default

    Quote Originally Posted by Noexit
    China (South Pacific) Development Co.Pte Ltd had tender this construction project from AllGreen for 29 months since 1 Sep 2011 and expected to complete by 1 March 2014. Something to share to all R38 owners.
    but I heard the development is actually delayed. Anyway, targeted TOP should be at Sept 2014, for what I know.

  20. #620
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by ayahiro
    but I heard the development is actually delayed. Anyway, targeted TOP should be at Sept 2014, for what I know.
    I didn't heard that , this is their contract so I dun think they will delay nowadays labour cost so high they will finish ASAP. Who tell you that they will delay from who ?

  21. #621
    Join Date
    Apr 2011
    Posts
    98

    Default

    Quote Originally Posted by Noexit
    China (South Pacific) Development Co.Pte Ltd had tender this construction project from AllGreen for 29 months since 1 Sep 2011 and expected to complete by 1 March 2014. Something to share to all R38 owners.
    march 2014 seem likely seem its alrady building at 13th floor. another 12 more to go

  22. #622
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by Estrangable
    march 2014 seem likely seem its alrady building at 13th floor. another 12 more to go
    1 mth they can bulid 2 to 3 floor so by this year nov to dec they able to floor and use 3 to 6 mth to do the external then can top . i think lastest will by june 2014.

  23. #623
    Join Date
    Apr 2011
    Posts
    98

    Default

    Quote Originally Posted by Noexit
    1 mth they can bulid 2 to 3 floor so by this year nov to dec they able to floor and use 3 to 6 mth to do the external then can top . i think lastest will by june 2014.
    developer want to top asap to recieve the $$...especially it's already 99% sold less the penthouse with swimming pool

  24. #624
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by Estrangable
    developer want to top asap to recieve the $$...especially it's already 99% sold less the penthouse with swimming pool
    True this I agree let hope by mar to jun 2014 can top .

  25. #625
    Join Date
    Feb 2013
    Posts
    30

    Default

    Good Morning Fella Owners!

  26. #626
    Join Date
    May 2012
    Posts
    36

    Default

    Anyone bro willing to share recent caveat for R38

  27. #627
    Join Date
    May 2012
    Posts
    36

    Default

    Anyone brought the 3 bedder penthouse?

  28. #628
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by Areivir
    Anyone brought the 3 bedder penthouse?
    I think still not sold .

  29. #629
    Join Date
    May 2012
    Posts
    36

    Default

    Quote Originally Posted by Noexit
    I think still not sold .

    Hi noexit any idea how much it cost?

  30. #630
    Join Date
    Apr 2011
    Posts
    98

    Default

    Quote Originally Posted by Areivir
    Hi noexit any idea how much it cost?
    Rem it was 2.2 mil during Aug period...may have increased since then

Similar Threads

  1. Replies: 29
    -: 23-08-15, 17:09
  2. River Bay (92 units) - Allgreen - Mar Thoma Rd
    By mcmlxxvi in forum District 12
    Replies: 490
    -: 29-11-14, 15:18
  3. Centra Studios (D14, 51 units, 8 storeys)
    By mcmlxxvi in forum District 14
    Replies: 97
    -: 03-09-12, 18:44
  4. Replies: 2
    -: 22-06-08, 11:34
  5. 2-storeys condo in lakeside
    By midnight in forum West and North West
    Replies: 1
    -: 16-03-08, 22:58

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •