With NeWest apartment only 59,and lots of retail shops and eatery,HT once again gonna be a steal..
Is TOP in May?
With NeWest apartment only 59,and lots of retail shops and eatery,HT once again gonna be a steal..
Is TOP in May?
08/04/2013 15:17:13Originally Posted by nirhas
BCA-CSC-APPLN FOR SITE INSPECTION
DATE CONFIRMED
This means TOP around early JuneOriginally Posted by jonleelk
They are just planted a few months ago. Maybe traumatised by the transplant. I don't think there are 100 trees though.Originally Posted by azeoprop
Hi...anyone selling hundred trees now?
I don't think anyone owns the trees there, so nope, not even one tree. Anyway no use staying in a tree. Mount Sinai on the hill is more suitable for you.Originally Posted by yowetan
He cannot afford anything even if circumstances to his favor.Originally Posted by hyenergix
That's his virtual character here. He may be a multi-millionaire in real life.Originally Posted by mygeemeel
This morning while driving pass HT along AYE, was able to take a more detail look due to the super jam on AYE. All the balance blue protective film on the windows of the last 3 blocks all removed already. Painting of the clubhouse has started.Originally Posted by hyenergix
Seems like TOP inspection very soon.
Originally Posted by jonleelk
Upon TOP in June 2013, the 2 bedders should be worth at least $1500 psf versus next door Newest 2-bedder around $1650 psf that is launching in early May 2013.
2nd inspection?Originally Posted by jonleelk
A1369-00564-2007-BP01
BCA-CSC-APPLN FOR SITE INSPECTION
DATE CONFIRMED
20/05/2013 18:37:29
Property around that area (Monterey Park, Botannia, Carabelle, Infiniti) must have risen like 30 to 40% over the past 2 to 3 years.
JLD HT and Newest effect?
"Never argue with an idiot, or he will drag you down to his level and beat you with experience."
[QUOTE=jonleelk]2nd inspection?
A1369-00564-2007-BP01
BCA-CSC-APPLN FOR SITE INSPECTION
DATE CONFIRMED
20/05/2013 18:37:29[/QUOTE
I didnt get it..
Is it TOP going to be delay to 3rd quarter?
[quote=nirhas]No change in indicative TOP date. Should be final inspection.Originally Posted by jonleelk
http://www.cdl.com.sg/app/cdl/custom...p_progress.xml
[QUOTE=hyenergix]CDL webpage only update once per quarter. However, my guess is also a follow up inspection.Originally Posted by nirhas
Drove past HT this evening. Not many workers working there already. A few units lights were on with workers doing some finishing touch-ups.
A1369-00564-2007-BP01
BCA-TOP-APPLN
APPROVED
18/06/2013 17:21:35
Great! Hope to get my keys in early JulyOriginally Posted by jonleelk
So TOP won't be in June??Originally Posted by hyenergix
Any idea if they install fibre optic cabling??
TOP already. Now we are just waiting for key collection.Originally Posted by nirhas
The fiber optic should be in place since when it was announced that all new projects must have it, HT was still at the foundation stage.
Already TOPed on 18-Jun.Originally Posted by nirhas
congrats too all HT owners.
"Never argue with an idiot, or he will drag you down to his level and beat you with experience."
S&P got mention development got 100 tress?
I think there are, but they are still pretty small. But I think 2 years time, it will be nice, but also mean headache for the cleanersOriginally Posted by mygeemeel
"Never argue with an idiot, or he will drag you down to his level and beat you with experience."
Hoping that the Fiber Optic point terminates in the structured cabling termination area since this project is supposed to be equipped with structured cabling to every room. Have yet to receive any letter from developer or lawyer asking for money though. Hoping it won't be as long as Ascentia Sky.Originally Posted by hyenergix
I am owner of a studio unit. 484 Sq ft. The last transaction for this type of unit was $1548 psf in Jan 2013
Thinking of making a quick buck at $1800 psf.....
any others like me?
Last week, I sneaked in for a private preview before I was detected by the security guard....
Great feeling... lots of greenery, almost overgrown even....
The Cherry Blossoms were not in season though......
The additional swimming pool in front of the studio block (93) was hmmmm..... a bit small .....
This was the site before the bulldozers came in.....
This was in March 2013...... they left the side gate opened..... so I decided to take a look.....
View from the other side of the fence in March 2013
View from main road.....