It is taken from the 19th floor of block 104 opposite mezzo. Stacks 1, 2 and 6 are facing quality hotel, so I guess 16th floor and above should be able to get this view.Originally Posted by vtaykw
It is taken from the 19th floor of block 104 opposite mezzo. Stacks 1, 2 and 6 are facing quality hotel, so I guess 16th floor and above should be able to get this view.Originally Posted by vtaykw
as advertised:Originally Posted by azeoprop
Update 14th Mar 2011.
Update from Soilbuild:
http://www.soilbuild.com/r_current_p...the_mezzo.html
Ceiling height seems quite ok. Managed to speak to one of the supervisors last week. Seems that still on track to TOP by end 2011.
As of 19 Mar, building 16th floor and lift level at 17.
Thanks for the update! Can't wait to collect the keys to my first property!
Why are all the mixed development projects along Balestier alll built with the front part nearer to Balestier road at lower levels than the back part? Look at Mezzo .. The part of the building nearer to Balestier road is lower.. Is there a constraint/limit on the height of the building that can built nearer to the main road?
Hi, just wonder when the developer will draw the next portion of loan?
haha.......me too
Originally Posted by azeoprop
Only 1st 10% so far.Originally Posted by kskong2000
Another sub-sale in march
775sqf
1200psf
930k
1mil is on its way
think this guy make a good profit...
lawyer call me to get my new mailing address... think it is time to draw down
This project progress has been very slow.. some projects launched around the same period, already rec'd TOPOriginally Posted by fhchoong
Maube its coz the main road always jam and hard for the trucks to get in out of the site?Originally Posted by Rysk
You still haven't got the answer where to view the transaction with unit detail?Originally Posted by kskong2000
http://www.streetsine.com
#27-01
983psf
762k
24 Jun 09
haha, now finally i know haha
thanks ya...
Originally Posted by fhchoong
Just received a letter from the lawyer telling me to pay up the next 10% liaoz. haa haa.
Update 31st March 2011.
Just wondering if soilbuild will provide electric induction hob instead of gas hob as there is no town gas supply to this project.
You can't wait to cook at your new home?Originally Posted by azeoprop
The one showed at showflat is the gas type. Not sure SB will later change their mind. Definitely will save some space without the gas cylinder.
Still waiting for the next 10%... no letter yet.
Might burn a hole in the pocket too.Originally Posted by azeoprop
Update 13th April 2011.
any idea which floor already? seem like 18?
Yeap, they are doing level 18.
Whose the dev? Soilbuild?Originally Posted by azeoprop
Felt so surreal, met with an accident yesterday and woke up I am lying in TTSH ward, facing the Mezzo....sianz, will be down for 2 weeks to recover the injuries, still trying to recollect what happened.
speedy recovery....Originally Posted by azeoprop
Originally Posted by azeoprop
Aiyoh, poor thing! What happened, man? Never mind....good fortune will follow after this. Maybe, you'll be able to buy a better unit at a steal after you discharge!
get well soon ya....
Take care... at least Mezzo can accompany you...
Thanks all, I am now discharged to rest and recover at home.