Wishing you quickest recovery!Originally Posted by azeoprop
Wishing you quickest recovery!Originally Posted by azeoprop
Originally Posted by azeoprop
oh dear. rest well and take care!
go for review at the first sign of any symptom, hopefully none.
Wat happen to u? I hope u din sneak in to see mezzo and kana hit by construction. HeeOriginally Posted by azeoprop
Anyway take care dude
Rest well, speedy recovery!Originally Posted by azeoprop
Get well soon.
Thanks all!
Update 28 April 2011. With new angle from rocca balestier.
Nice pics! How did you manage to take from RB? You went to the foot massage
Hi azeoprop, u still can take pic while have injury huh...Good effort man..
a bit dissapointed with the progress...Hai...
The progress so far is ok... 10 days per floor. 19th floor should complete by end Apr.
If you check out property guru, you can find mezzo office is for sale. The TOP date stated is between end 2011 and 1Q2012. The agent probably got the info from SB
There is also a floor plan showing which office units have been sold.
I climbed the metal stairs of RB all the way up to the locked door at the pool level to take those shots.
I am mostly recovered liaoz, just a bit of wrist sprain and shoulder pain to deal with, salonpas will do the trick.
wah...i like ur dedicationOriginally Posted by azeoprop
how many flrs u climb?
Wow! Another penthouse sold for $1 388 888 Apr2011.
Wow u r truly devotee of mezzo. Soilbuild will be happy to engage u to be their spokespax. Yeah I amaze your courage and determination.Originally Posted by azeoprop
Update 7th May 2011.
Soilbuild's update on 30th April 2011.
http://www.soilbuild.com/r_current_p...the_mezzo.html
from the last pic, look like they are doing interior work while doing the construction of upper floor... hope to have new house for the next chinese new year
Yah, I think so, the lower floor ones are already doing the 3rd stage of the progressive payment.
Update 23rd may 2011.
Nice! Looks like it is going to complete soon
Send email to SB to ask about the expected date of completion but no reply... think they don't want to over-commit themselves.
Update 2nd Jun 2011.
Any wondering what is the size of the swimming pool in Mezzo?
looks like not much change leh...quite slow lehOriginally Posted by azeoprop
Expected..Originally Posted by jezz
One side is 12m and another side is 8m. L is about 30m if what the sales previously told me is correctOriginally Posted by vtaykw
Am i right to say the below are owners of mezzo?
-azeoprop
-kskong
-vtaykw
-jess
-hcl
-rysk
-corn
yes for me...
Originally Posted by fhchoong
Latest update from Soilbuild:
http://www.soilbuild.com/r_current_p...the_mezzo.html
some pics on the offices:
http://www.commercialguru.com.sg/lis...sale-the-mezzo
Do anyone here have any idea on the drawndown status for progrssive payment scheme now? till now i still havent received any letter for draw down..a bit weird for mid floor unit
My installment already paying 10+10+5% liaoz.Originally Posted by kskong2000