That day I dropby W28 to look see. Saw a few people around the building who like me also tried to get inside. Must be the eager owners. Looks like HDB upgraders.
That day I dropby W28 to look see. Saw a few people around the building who like me also tried to get inside. Must be the eager owners. Looks like HDB upgraders.
I read an investment analysis on PT Sertia, it mentioned that PT have enbloc this leong bee at potong pasir, and potong pasir has great potential, especially the plot of land behind the mrt station was earmarked for commerical cum residential project under the masterplan. Look like giving another 3 - 5 years, this place will be very different.
Originally Posted by ginseng1
It is almost done! What a nice looking building!
Yee ha! Did I tickle your funny bone?
yes, is indeed very nice.
Originally Posted by ecimbew
When can collect key?Originally Posted by Armstrong
Call fraser . Assuming the roof structures at e driveway is completed this week. At least 5-6 weeks....Originally Posted by DC33_2008
The basement carparks must also be ready which we can't see from outside!Originally Posted by Cyberknight
...and to think that in early 09, it was selling around 780psf.
If they are to build anything on the plot of land between HDB shops and MRT station, it will be commercial and residential according to ura master plan 2008.
Yee ha! Did I tickle your funny bone?
I can hear the soothing sounds of the water at the swimming pool yesterday night when I walked around. Lane painting are done. I'm sure the land next to MRT will be developed. So prime. Another condo? Hope not else everywhere construction.Originally Posted by ecimbew
When it was launched in 09, developer couldnt sell and had to lower price. I hope enough parking lots. hose with 2 cars how ah? Got lots or not?
Anyone sneaked into Leong Bee so far?
I went to ninth floor yesterday night at Leong Bee and looked at W28. Really nice.
I also saw this #09-02 unit at LB. Very well done. Pity the owner who had spent a bomb renovating their unit but I'm sure they are now laughing to the bank.
I also hope there will build a commercial and residential building, but when will this happen? This has been in the master plan for so many years....Originally Posted by ecimbew
Will it happen?
How to have commercial and residential building?Originally Posted by wkang1970
Compass Point?
Land too small. Might as well make it condo like Kovan Residence.
Small ? sure a not. That plot of land is quite big hor ..if you imagine it is cut half by the P P walkway. Can be a mixed development with shopping mall and office space, may be some residential horOriginally Posted by ginseng1
alamak is right, that is not small. Anyway it is already in the ura master plan. In the past, this will not happen, but now, it is possible ok. Who know it may be pretty soon?Originally Posted by alamak
here another pic
...........
Is the bus-stop still there?Originally Posted by wkang1970
Woodsville junction flyover to open on July 31
Posted: 27 July 2011 1523 hrs
SINGAPORE: The new flyover spanning the Woodsville junction will open to traffic on Sunday at 10am.
The Land Transport Authority (LTA) said the 400 metre flyover will connect motorists directly from Jalan Toa Payoh to Jalan Kolam Ayer leading to Kallang Way and the Pan-Island Expressway towards Changi, bypassing the Woodsville junction below.
The new flyover is part of the upgrading project for the Woodsville Interchange to improve overall traffic flow at the busy interchange.
Besides the flyover, the LTA is also constructing three vehicular tunnels to improve the overall traffic flow at this junction.
Works to upgrade the Woodsville Interchange started in 2007 and are expected to complete by the end of the year.
- AFP/fa
Yup.Originally Posted by DC33_2008
A redundant bus stop.
They should remove the bus stop and the birds near the mrt. Very irridatingOriginally Posted by ginseng1
Yesterday drove past, Woodsville 28 signboard is up at the side gate besides the bus stop. But the steel structures for the drive ways are still in progress.
think its mentioned in the news.. flyover operational soon.
Yes very exciting news for residents staying there.Originally Posted by kingkong1984
I just realised that W28 is right in front of the slope up from the tunnel.
Many cars sure accelerate harder when going up the slope. Gonna be very noisy.
I was standing at the bus stop and already somany idiots accelerate so hard.
Every time the traffic turn green, those motorist will rev like crazy.
Do the W28 windows have double panel to block out the road noise?
Breathtaking view looking at W28. which has unblocked view all the way to Mt Vernon. Not sure if Nin Residences will block it.
If u wan unblock views n quiet unit, why dun u consider nin residence, units facing landed ( but there is a mosque)? Or wait for the PP mrt plot opp nin residence? Tender closing soon.
Didn't know that the plot behind PP MRT is open for tender. W28 asking for $1200 PSF.
Please have a 5 year min occupation imposed to curb these speculators.
Curious... Why do you want to look at Mount Vernon?Originally Posted by ginseng1
Yee ha! Did I tickle your funny bone?
Referring to the park.Originally Posted by ecimbew