Originally Posted by kEN9170
to convert to dry + wet kitchen, have to pay 2k+ more. actually the wet kitchen is quite small, by converting it, there will be less usage space. me not converting.
Originally Posted by kEN9170
to convert to dry + wet kitchen, have to pay 2k+ more. actually the wet kitchen is quite small, by converting it, there will be less usage space. me not converting.
I bought level 10... think stack 26 slightly nearer to the PIE... you can hear the cars when you are standing along the drain separating the park and WW.Originally Posted by kEN9170
See that you guys like park facing.
Just quoting a price for a good floor unit for your reference for park facing.
#06-26 - 1270 sqft (118sqm) - Type B2 - $775,800K nett (Progressive Payment)($611psf)
* subject to change without notice
Hope to see you guys this weekend @ our new showflat. Cheers
Roger Tan HSR - 9061-9884
Developer's Appointed Sales Team
Just came back from the showflat. Was abt to commit stack 26 #05-26 for a good deal @ 585psf. But after a discussion with the loan officer, the developer revised the price up to 606psf. In the end, we decided to re-consider.Originally Posted by noblebaby
Originally Posted by kEN9170
did developer quote you 585 today n then increased to 606 today?
Yes. That was the so call walk-in starbuy price. Had a long discussion with bankers & my agent. While was abt to commit, the new price list came out.Originally Posted by sunny
oh... 585 n 606 .... alot of difference..... am i right to say 606 no star buy? if yes, tell the agent to ask developer to absorb stamp duty...Originally Posted by kEN9170
Wow... you must have really felt cheated. Did they give you a reason why the sudden increase in price?
606 is also their starbuy price. But 585 is their "special" walk-in starbuy price. I heart pain.....Originally Posted by sunny
Which stack did u buy?
stack 19 high floor..... actually 606 still can consider ..... i paid 770Originally Posted by kEN9170
hmmm..i sense that the developer is seeing more interest from people ..Originally Posted by kEN9170
OR it is the agent that is trying to earn the spread!
I agree... I dont think stamp duty will be absorbed.Originally Posted by sunny
Stack 19 a premium unit...pool facing. Great view!Originally Posted by sunny
Was hoping my agent can negotiate for a better discount...
any idea where will be the new mrt station exact location?
my guess is along temasek poly... u can try to ask developer to absorb stamp duty.... my did absorb ....Originally Posted by kEN9170
Who told you the price has increased after lengthly discussion, from the mouth of agent or representative of developer? I smell rat here... it's either agent see your strong interest and want to earn more commission... or the developer plays cheat here.Originally Posted by kEN9170
If no body interested on that unit, price may fall back to original walk-in price. Some of them are not honest!
my guess is along the reservoir, from kaki bukit, to poly tech, to Tampines. Hope the track does not destroy the natural surroundings.Originally Posted by sunny
Last edited by noblebaby; 20-03-09 at 17:18.
There is no walk in starbuy price... all price quote are developers price. Be it from agent mouth or developer directly.Originally Posted by kEN9170
I have just double check, price is $606 psf. I think they have misquote or false marketing.
Wrong reply.. SorryOriginally Posted by noblebaby
When did you buy yours?... which level you bought?Originally Posted by sunny
ERA or HSR service you?
I was served by Far East sales guy... weeks ago...Originally Posted by cheahsg
I also suspect he misquoted tthe price. Cannot imagine if i sign the Purchase Option with the misquoted price...he may have to top up 26k diff.Originally Posted by cheahsg
did u see the big map display in the showflat...there is a blue dotted line running across bedok town park....according to fast east guy, he said that was the confirmed future underground mrt track...which will be ready in year 2018.Originally Posted by noblebaby
hi Sunny, did you get your unit recently? Did ask for stamp duty absorption....but cannot. But they agreed to change the lower kitchen cabinet from white to brown surface as shown in showflat. Only 4 bedded units are in brown furnishing.Originally Posted by sunny
hmmm i can't seem to reemeber seeing white cabinet at the showroom..
was that what the agent told you??
Originally Posted by kEN9170
The kitchen cabinet in the current showroom is having white top cabinet and brown grain (zen colour) lower cabinet. This type of furnishing only for 4 bedded units. However, All whites for 3 bedded units.Originally Posted by Nico
Ken, did you get the unit?Originally Posted by kEN9170
Based on info from LTA website, DTL stage 3 will be running from Chinatown to Tampinese via Bedok, but the actual stations and track location are still not finalized yet... Furthermore, the new line will be completed by 2016, 2 years earlier than the initial proposal.
I hope the track is underground, I don't want to see it infront of my balcony!
Last edited by noblebaby; 20-03-09 at 20:24.
That was my thought also, don't want to see the mrt track. The agent says its underground, but hard to say. usually at heartland estate the mrt track usually is above ground.Originally Posted by noblebaby
hmm my sense is that the govt will be smart enough NOT to build the mrt track across the bedokpark unless they don't want anyone to go there for a walk/jog
Originally Posted by kEN9170
sure hope so.. but just imagine if the track is along reservoir, those low flow condo facing the reservoir will be cursing..Originally Posted by Nico
Background of The Downtown Line
1. The construction of the $12 billion Downtown Line is part of the plan to develop a comprehensive rail network system to meet our travel needs in the future.
2. The Downtown Line will be built in three stages with a total of 33 stations. These three stages are as follows:
• Stage 1: The 4.3km Line comprises 6 stations. These stations are: Chinatown, Cross Street Landmark, Bayfront, Promenade and Bugis. Stage 1 of the Line will be completed in 2013 and will provide a strategic transport link to serve workers, residents and visitors in the exciting Marina Bay area and upcoming developments such as the Marina Bay Sands Integrated Resorts and the Marina Bay Financial Centre.
• Stage 2: The 16.6 km Line will feature 12 stations. When completed in 2015, Stage 2 of the Line will run from Bugis along the heavy Bukit Timah traffic corridor to help ease congestion. Commuters traveling from Bukit Panjang to the city will be able to cut their travel time by 10 minutes.
• Stage 3: The 19.1km Line will feature 15 stations. It will run through MacPherson, Bedok Reservoir and Tampines ending at the East West Line Expo Station. Scheduled to be completed in 2016, it will reduce travel time by 10 minutes for commuters traveling to the city from Bedok Reservoir and Tampines.
3. The Downtown Line is projected to see a ridership of more than 500,000 daily when in full operation. Construction of Stage 1 of the Line is under way.
http://www.lta.gov.sg/images/Annex_4_Bkgd_DTL.pdf