3 bedder Units left no good facing etc?Originally Posted by visionaries
3 bedder Units left no good facing etc?Originally Posted by visionaries
Leftovers are Type C1 and C2 3 bedders, facing Macpherson Road. 13th and 14th floor.Originally Posted by gwlip
Quite strange the leftovers are the topmost floors, just below the penthouses. could be the higher prices.
hello skygreenian, lol!
I drove past last week and all the existing occupants have already vacate the building.
Seems like they are going to demolish it very soon!
wow..from URA:
SKY GREEN MACPHERSON ROAD Condominium 1 790,000 463 Strata 1,707 Jan-13
drove pass yesterday.
Demolition works going on soon! Machines at the top level liao
Hi guys, have the developer call for loan disbursement yet? Bought since Nov 2012 and loan not even drawn yet..
just received letter from lawyer calling for 10% disbursement. Foundation completed. Should be quick from here.
I received an email from agent saying that 8river*uites at Boon Keng offering 10-20% disc.
That one total over 800units..sales wasn't too good.
Indeed, i like it that it's not so crowded like Potong Pasir and still close to amenities. My office will be nearby at Paya Lebar.
I bought pool facing and high floor
Btw, i saw on URA 2013 master plan that they might build a healthcare / hospital beside at the open field. Good that our rental might be supported by nurses or doctors.
Any thoughts?
Mine is on 2nd floor. Very very low as the rest all taken when I booked.
Pool facing too. Hopefully not too noisy.
Where you see the masterplan? There is a underground tunnel (KPE) below the park, so I thought building something on it can be challenging.
You can check the ura masterplan 2014 and will be able to see that the field on the right of skygreen is reserved for healthcare structure
The land beside skygreen is now fenced up and there are some ground construction work going on. I guess they are doing soil testing etc?
btw, the developer seems to be very slow in calling for loan disbursement leh.. uptil now only called first 10%. Good or bad for us?
I drove to site yesterday since i work nearby. Some pics for update.
this is the site which i mentioned. I went to ask the workers and they said they are building a temp showflat for a condo. I think its for the UOL project beside bartley residences.
Thanks for the update. It seems one block is completed to full height and the other block is still halfway?
Hi Visionaires, me too.. Just called for next 10%.. Top might be q4 2015 as per the contract details board outside the condo. 1 more year or less!
Both blocks are already fully built to same height..haha might be my photo angle.
Seems like the exterior is all done. How long more do we need to wait for TOP typically? I really hope it can TOP ASAP
I see that they had finished painting the car park!
Hope they finish paint the whole block soon.
Current progress ontrack.. Just saw the skin last week. Looks really nice those curves haha
Btw, they are really slow in calling for loan disbursement dont u agree? And this small development is abit slow! Why r they taking their time? Dont they (heeton n joint partners) want to faster build finish and collect $$? Haha
updated pictures taken on 21/7 while driving by:
I see that the roads and plants are all in place. Swimming pool also have water already.
Anybody know when is the expected TOP?
Sky Green @ Macpherson Road D13
https://www.facebook.com/groups/394491784033892/
"Status = Processed", and "Current Status = In order" means? TOP anytime?
Agents have been flooding my mailbox with letters obviously for rent/sale. Hahaha
They told me end of Oct or Early Nov TOP!
Like finally!
Oh yes, many thanks for the facebook group. Already applied to join. Cheers!
Looking forward to collecting keys.
We just collected our Bartley Residences keys as well on Monday.
I will pop by tomorrow to take pictures! Stay tuned..
Time passes too fast!
Really love the flow of those sexy curves instead of standard rectangularish looks of other condos.
Looks fantastic!
I was told mid Nov can collect keys, but up to now still no letters from developers. Getting impatient. Haha.