Originally Posted by mkmm
haha.. google map that one was at least 3-4 years back old photo liao they never update...
Yes! I want it built! If you are Men in White! You better do it to get my vote!
No. I want to end my miserable life in Singapore, e.g. falling off congested MRT platforms.
Ehhh... Seriously, I don't care because I'm an elite and I stay in CCR like the President.
Originally Posted by mkmm
haha.. google map that one was at least 3-4 years back old photo liao they never update...
Haha...the small curve road looks like space cater to erect the future station.Originally Posted by xemz127
Originally Posted by mkmm
those were the works of the longkang that running in parallel with the Simpang Kiri longkang.. and also the junction work of CL... but all already done..
too bad google map too long never update singapore map already.. many landscape already changed~
possible to complete by 2015? simple station will do, no need to consider so long as long can up and down like bus stop, SMRT can save building cost
No. I repeat. It will be ready in 2016Originally Posted by LG168
You can repeat againOriginally Posted by Pro888
2016 not dad liao , dun let people wait till .Originally Posted by Pro888
Someone mentioned 1C now 84% sold from 70% end of march. Probably going to announce soon. Me dun need to repeatOriginally Posted by cedarlake1
Will it be tomorrow?
No....all MPs are very busy!Originally Posted by Pro888
the lands next to the canberra link are indicated as residential. so, will there b some commercial used land at the MRT track side?
Originally Posted by NorthernStar
for sure the track side will be commercial or mixed development
Yes. They are. Shell gas leak.Originally Posted by mkmm
Not today, then another 2 weeks ??
Emm... different MPs leh.. this canberra area belong to sembawang but the shell station belong to nee soon.Originally Posted by Pro888
for these new BTOs, do you notice the map direct you to canberra lane directly? meaning MRT is around there!!
IT will be good for CR and NR residences!
http://esales.hdb.gov.sg/hdbvsf/eampu05p.nsf/0/13MAYBTOSB2_page_5789/$file/about0.htm#
THe MRT will at 1.447273, 103.83352!
Busy because of SMRT finds rail crack on North-South line stretch, slows down trains.
Disruption to train services on the North-South line caused crowding at Sembawang station.
Thy that NS 12 delay again?
sibeh sian
Originally Posted by xemz127
Good that the 3 storey commercial blk is @ Eastbrook instead of Eastwave.
Just like Greenwich V plot - MP2003 zoned as purely residential to MP2008 as mixed dev.
The failure to address on the transport by the authority reflects the super low take up rate. Bus 169 & 882 not near to most units.
Government con job as usual...............Originally Posted by Pro888
"Planned NS12"..... they really treat Singapore citizens like idiots sometimes and expect BTO to be subscribed with "Planned NS12"
Bote them lahOriginally Posted by solsys
Is the contract awarded?
The tender amount put in by bidders have been updated only recently. I think this contract will be awarded soon. Longest period for any LTA tender to be awarded after closing was 4.5 to 5 months. This one 3.5 months liao.Originally Posted by NorthernStar
The tender is for "consultancy" only. How long would it be for the actual station to be built after this tender?Originally Posted by Pro888
Asuka.
SINGAPORE — The Land Transport Authority (LTA) has awarded the S$285 million contract to Samsung C&T Corporation to expand Caldecott station into an interchange.
Construction of the station and tunnels will being next month and when completed in 2020, Caldecott station will connect the future Thomson Line with the Circle Line.
It currently takes about 40 minutes to get from Woodlands to Caldecott, taking the North-South Line and transfer to the Circle Line at Bishan said the LTA in a statement today (July 25).
However, with the new interchange, commuters will have a direct route, reducing travel time to 25 minutes.
LTA has also awarded a S$421-million contract to Shanghai Tunnel Engineering for the construction and completion of Thomson Line tunnels in Woodlands.
The contract includes tunnels linking Woodlands station to the Mandai depot.
Construction of these tunnels will start this August and is targeted for completion in 2019. CHANNEL NEWSASIA
Wherer is NS 12
It was announced couple of months back.... Maybe we missed it or we were all misled.Originally Posted by LG168
Where is NS12?
It's in their 'Plan', note the word 'Plan'. It was never confirmed unlike Downtown East Line.
Yes, its PLAN only lah, don't take it so serious!Originally Posted by solsys
plan ho liao, now waiting for approval.......... must push harder.