Page 26 of 40 FirstFirst ... 61116212223242526272829303136 ... LastLast
Results 751 to 780 of 1178

Thread: Eight Riversuites @ Whampoa East Road (United Engineer Group LH 99 Years)

  1. #751
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    What I could think of is nowadays ppls hardly cool at hm and want to have to make full use of the livable space. Open concept kitchen could make the whole place look bigger and only one disadvantage is still the heavy cooking would be harder here and traditional Chinese house owner might not like the concept as the door open to face stove is alway a bad fengshui. One thing that turn me off is the AC ledge is all over the whole unit which I think from outside look nice on the building facade but owners are wasting money to pay for these. I rem last time a agent told me that all the units are using a centralized air con system then in my mind why the need of AC ledge ?

    Quote Originally Posted by timmy
    I see an increasing trend of new developments with layouts where the kitchen is at the main entrance. Personally, I have no problem with it but I understand not all are like me.

    Just curious why developers are increasingly adopting this design. Is it reflective of a new trend of preference, where more homebuyers are open to new living concepts? I mean, when I read renovation forum and there are discussions about premium luxury brand fridges being displayed in the living room near the door entrance, as a designer item akin to an expensive piece of furniture, it seems that the new living concept is catching on.

  2. #752
    Join Date
    Mar 2012
    Posts
    259

    Default

    Quote Originally Posted by Noexit
    What I could think of is nowadays ppls hardly cool at hm and want to have to make full use of the livable space. Open concept kitchen could make the whole place look bigger and only one disadvantage is still the heavy cooking would be harder here and traditional Chinese house owner might not like the concept as the door open to face stove is alway a bad fengshui. One thing that turn me off is the AC ledge is all over the whole unit which I think from outside look nice on the building facade but owners are wasting money to pay for these. I rem last time a agent told me that all the units are using a centralized air con system then in my mind why the need of AC ledge ?

    Have to agree with you. Looking at Sennett's strong sales, and their use of open kitchen layout at entrance, my take is that people are becoming more accepting of this design. The AC ledge is indeed a waste of space, but most new developments have large AC ledge anyway, so buyers can only suck thumb.

  3. #753
    Join Date
    Mar 2012
    Posts
    259

    Default

    8RS is advertising its "2nd phase" of launch, trying to ride on the success of the Sennett. Wonder if it is enjoying any positive spillovers?

  4. #754
    Join Date
    Feb 2013
    Posts
    10

    Default

    anyone know how's things going for 8RS?

  5. #755
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    455 Out of 862 sold.
    About Half sold
    Quote Originally Posted by Garandbutt
    anyone know how's things going for 8RS?

  6. #756
    Join Date
    Feb 2013
    Posts
    10

    Default

    Quote Originally Posted by Noexit
    455 Out of 862 sold.
    About Half sold

    hmmmm

  7. #757
    Join Date
    Jun 2009
    Posts
    5,675

    Default

    Mainly the upper floor units with ultra high psf in the inventory.

  8. #758
    Join Date
    May 2011
    Posts
    65

    Default

    Quote Originally Posted by Garandbutt
    anyone know how's things going for 8RS?
    Found from property guru
    Last 4 units of one bedroom :
    #28-04
    #28-14
    #29-04
    #29-05

  9. #759
    Join Date
    Feb 2013
    Posts
    10

    Default

    Thanks for e update Noexit ñ KCT~!

  10. #760
    Join Date
    May 2011
    Posts
    65

    Default

    Quote Originally Posted by azeoprop
    Mainly the upper floor units with ultra high psf in the inventory.
    Comparing with nearby new launch ...
    think 8RS price quite reasonable ,
    United Engineers Developments Ltd (UE) had acquired this land parcel at the S$543 million (S$774 psf) ,
    the breakeven cost should be around $1,200 psf.
    There aren't many sites like this in GLS programme

  11. #761
    Join Date
    Mar 2012
    Posts
    259

    Default

    Quote Originally Posted by KCT
    Comparing with nearby new launch ...
    think 8RS price quite reasonable ,
    United Engineers Developments Ltd (UE) had acquired this land parcel at the S$543 million (S$774 psf) ,
    the breakeven cost should be around $1,200 psf.
    There aren't many sites like this in GLS programme
    Even Hillview Peak is priced at around same average level as 8RS. This project quite good value for money, I must say.

  12. #762
    Join Date
    Apr 2013
    Posts
    39

    Question

    One bedroom and two bedroom units fully sold. More tenants than owners shall be staying there

  13. #763
    Join Date
    Mar 2012
    Posts
    4

    Default Site Update




  14. #764
    Join Date
    Oct 2012
    Posts
    144

    Default

    Bro,

    From which building u captured those pictures? Can you see Regent Residences from there?

  15. #765
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by angel.tan
    Bro,

    From which building u captured those pictures? Can you see Regent Residences from there?
    I think the direction cannot see regent residences . Block by euro Asia condo

  16. #766
    Join Date
    Apr 2011
    Posts
    28

    Default

    The land is flat? How come no metal things sticking out?

  17. #767
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by primeesense
    The land is flat? How come no metal things sticking out?
    Maybe the construction haven't start

  18. #768
    Join Date
    Oct 2012
    Posts
    144

    Default

    Quote Originally Posted by primeesense
    The land is flat? How come no metal things sticking out?
    For Bored Piles technique, you hardly see any metal things sticking out until after the construction has started. I just knew this when RR developer sent me a letter informing me that the foundation had been completed, but when I passed by the site, little things seem to have been done.

    When the contractor starts digging, you will see the foundation.

    Any experts here care to comment.

  19. #769
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by angel.tan
    For Bored Piles technique, you hardly see any metal things sticking out until after the construction has started. I just knew this when RR developer sent me a letter informing me that the foundation had been completed, but when I passed by the site, little things seem to have been done.

    When the contractor starts digging, you will see the foundation.

    Any experts here care to comment.
    I pass by on early April the construction in the basement look have progress so foundation shd be ready soon

  20. #770
    Join Date
    Mar 2012
    Posts
    259

    Default

    Sales picked up somewhat in march, with 33 units sold compared to 16 in feb. seems to be benefitting from launches at PP.

  21. #771
    Join Date
    Jul 2009
    Posts
    214

    Default

    When can we expect the first payment? Have been waiting - neck long long..

  22. #772
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    [QUOTE=hovivi]When can we expect the first payment? Have been waiting - neck long long..[/QUOTE

    1st 10 percent when foundation ready

  23. #773
    Join Date
    Jul 2009
    Posts
    214

    Default

    [QUOTE=Noexit]
    Quote Originally Posted by hovivi
    When can we expect the first payment? Have been waiting - neck long long..[/QUOTE

    1st 10 percent when foundation ready
    I'm wonderin when will that be completed cos no sign of work yet...

  24. #774
    Join Date
    Apr 2013
    Posts
    39

    Default

    Not 80% sold yet, I think...

  25. #775
    Join Date
    Apr 2011
    Posts
    98

    Default

    Quote Originally Posted by delirious_jeff
    Not 80% sold yet, I think...
    not even 60%

  26. #776
    Join Date
    Apr 2013
    Posts
    39

    Default

    Quote Originally Posted by Estrangable
    not even 60%
    Really? Hope the developer got deep pockets and can start building

  27. #777
    Join Date
    Jul 2012
    Posts
    18

    Default

    They started piling tests last year, should have completed piling works. I saw the last piling rig was demobilized, not sure whether work stopped or completed. Developer has to complete the project within 5 years from the date they got the land.

  28. #778
    Join Date
    Jul 2012
    Posts
    48

    Default

    8RS no basement, should be very easy to construct. Basement alone takes 6 to 9 months to build.

  29. #779
    Join Date
    Feb 2013
    Posts
    10

    Default

    Quote Originally Posted by Congress
    8RS no basement, should be very easy to construct. Basement alone takes 6 to 9 months to build.

    8RS no basement uh?

  30. #780
    Join Date
    Jul 2012
    Posts
    48

    Default

    Quote Originally Posted by Garandbutt
    8RS no basement uh?
    If I am not wrong, no basement. The whole development is raised up. Swimming pool is actually at level 2. The so called "basement" connecting all blocks is at ground level.

Similar Threads

  1. United Engineers to sell UE BizHub East for $518m
    By reporter2 in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 08-07-13, 12:33
  2. Replies: 45
    -: 10-05-13, 22:17
  3. Replies: 49
    -: 04-01-13, 15:43
  4. 862-unit condo in Whampoa East launches today
    By reporter2 in forum Singapore Private Condominium Property Discussion and News
    Replies: 0
    -: 28-05-12, 16:53
  5. Bendemeer Road / Whampoa East Site
    By azeoprop in forum District 12
    Replies: 18
    -: 11-03-12, 20:20

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •