Page 7 of 9 FirstFirst ... 23456789 LastLast
Results 181 to 210 of 268

Thread: Canberra residence

  1. #181
    Join Date
    Feb 2013
    Posts
    69

    Default

    A1365-10003-2010-BP01 BCA-TOP-APPLN PROCESSING 17/06/2013 21:33:04 -

    TOP application just issued...

  2. #182
    Join Date
    Aug 2012
    Posts
    32

    Default

    Quote Originally Posted by cedarlake1
    A1365-10003-2010-BP01 BCA-TOP-APPLN PROCESSING 17/06/2013 21:33:04 -

    TOP application just issued...
    Thanks for the update. Can't wait for the next level!

  3. #183
    Join Date
    Aug 2012
    Posts
    32

    Default

    A1365-10003-2010-BP01 BCA-TOP-APPLN APPROVED 19/06/2013 7:21:46

    TOP Approved!

  4. #184
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by devilshin
    A1365-10003-2010-BP01 BCA-TOP-APPLN APPROVED 19/06/2013 7:21:46

    TOP Approved!
    Good good

  5. #185
    Join Date
    Apr 2013
    Posts
    2

    Default

    Wow.....that's great news!

  6. #186
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by Hippie3005
    Wow.....that's great news!
    Overview..


    http://www.saaarchitects.com.sg/proj...ra-residences/

  7. #187
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by cedarlake1
    Better than my expectation from the pictures.. hope the quality is ok.

  8. #188
    Join Date
    Apr 2013
    Posts
    2

    Default

    Agree, looks better than expected.

  9. #189
    Join Date
    Apr 2010
    Posts
    1,739

    Default

    already lose confidence in china con. not keen to rectify defects. just give excuses and use delay tactics

  10. #190
    Join Date
    Apr 2010
    Posts
    1,739

    Default

    but cr does not have many units so hopefully is better work quality

  11. #191
    Join Date
    Jan 2012
    Posts
    11

    Default

    Quote Originally Posted by Komo
    but cr does not have many units so hopefully is better work quality
    That's indeed good news.. How long will it take to receive Key after TOP approved...

  12. #192
    Join Date
    Aug 2012
    Posts
    32

    Default

    Just received call from law firm..

  13. #193
    Join Date
    Jan 2011
    Posts
    82

    Default

    yup.. i received call too..

  14. #194
    Join Date
    Jan 2011
    Posts
    82

    Default

    Future neighbours, you can join us on the facebook discussion in a closed group.

    http://www.facebook.com/groups/305009716245010/

  15. #195
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by Komo
    already lose confidence in china con. not keen to rectify defects. just give excuses and use delay tactics
    i also have this worry too.. Hope that not all the china firms are like that.. Getting keys soon, will know the actual quality by then.

  16. #196
    Join Date
    Aug 2012
    Posts
    32

    Default

    Passed by just now, and saw someone already moved in their furnitures.. wow, so fast!

  17. #197
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by devilshin
    Passed by just now, and saw someone already moved in their furnitures.. wow, so fast!
    A few neighbours feedback that those units are belong to MCC's staffs.

    Inital feedback: ceiling high is confirm @ 2.9m

  18. #198
    Join Date
    Jan 2012
    Posts
    11

    Default

    Quote Originally Posted by jenshuang
    A few neighbours feedback that those units are belong to MCC's staffs.

    Inital feedback: ceiling high is confirm @ 2.9m
    2.9m (9.5 foot) should be pretty good.

    I heard developer releasing keys as batch, from lower floor to higher.... so, might take some time for everyone to get notified on key collection...

  19. #199
    Join Date
    Aug 2012
    Posts
    32

    Default

    Except the 5th floor unit, I think it is by block too. Some blocks have been ready for some time.

  20. #200
    Join Date
    Jan 2012
    Posts
    11

    Default

    Quote Originally Posted by devilshin
    Except the 5th floor unit, I think it is by block too. Some blocks have been ready for some time.
    you mean, 5th floor is not ready yet? It looks like all units in all floors have been completed....It could be the requirement for TOP?
    i thought the spread key collection is to even out the crowd....

  21. #201
    Join Date
    Jan 2011
    Posts
    82

    Default

    it is block by block release.. so far, i knew blk 519, 521, 501 some owners have received letters. Some units need final cleaning before developer will release keys... didn't hear from any penthouse owner received their letter.

  22. #202
    Join Date
    Aug 2012
    Posts
    32

    Default

    I believe those penthouses on 5th floor might need re-painting. Saw many stains.

  23. #203
    Join Date
    Feb 2013
    Posts
    3

    Default

    Quote Originally Posted by jenshuang
    it is block by block release.. so far, i knew blk 519, 521, 501 some owners have received letters. Some units need final cleaning before developer will release keys... didn't hear from any penthouse owner received their letter.
    Understand that some of the owner will be collecting their keys this week, do share about the units and the workmanship.... Saw the workers are cleaning some of the units over the weekends

  24. #204
    Join Date
    Jan 2012
    Posts
    11

    Default

    Quote Originally Posted by ericlyk
    Understand that some of the owner will be collecting their keys this week, do share about the units and the workmanship.... Saw the workers are cleaning some of the units over the weekends
    anyone received the key and manged to visit your place?

  25. #205
    Join Date
    May 2011
    Posts
    599

    Default

    Agent's photos

  26. #206
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by jamprop
    anyone received the key and manged to visit your place?
    i will be collecting my keys tomorrow.

  27. #207
    Join Date
    Apr 2010
    Posts
    1,739

    Default

    Quote Originally Posted by NorthernStar
    Agent's photos
    looks good ...

  28. #208
    Join Date
    Aug 2012
    Posts
    32

    Default

    Collected my key today. The swimming pool and landscape are very nice! The bedroom apparently smaller than my expectation, putting a queens bed in MBR seem to be quite cramp.
    Facing some problems with the tiles.. Other than that, mostly are painting issues.. Waiting for them to contact me, see how to rectify it.. Feel the workmanship is not very satisfying.

  29. #209
    Join Date
    Jan 2012
    Posts
    11

    Default

    Quote Originally Posted by devilshin
    Collected my key today. The swimming pool and landscape are very nice! The bedroom apparently smaller than my expectation, putting a queens bed in MBR seem to be quite cramp.
    Facing some problems with the tiles.. Other than that, mostly are painting issues.. Waiting for them to contact me, see how to rectify it.. Feel the workmanship is not very satisfying.
    First of all many congratulations...
    Did the developer give you the dimensions of the bed rooms, living etc.,
    Wonder what is the size of the MBR? Is it 12X12 feet?
    Can you elaborate more on workmanship why you feel that it is not very satisfying.... the finishing of kitchen or toilet not good?

  30. #210
    Join Date
    Jan 2012
    Posts
    11

    Default

    Quote Originally Posted by devilshin
    Collected my key today. The swimming pool and landscape are very nice! The bedroom apparently smaller than my expectation, putting a queens bed in MBR seem to be quite cramp.
    Facing some problems with the tiles.. Other than that, mostly are painting issues.. Waiting for them to contact me, see how to rectify it.. Feel the workmanship is not very satisfying.
    Wondering what is the monthly maintenance cost / square foot?

Similar Threads

  1. Replies: 0
    -: 05-11-21, 11:42
  2. Provence Residence EC @ Canberra Link
    By handsometeck in forum Marketplace
    Replies: 0
    -: 03-11-20, 15:09
  3. Parc Canberra (Hoi Hup)
    By rsbeginner in forum Far North
    Replies: 3
    -: 20-02-20, 20:25
  4. PARC CANBERRA EC
    By yongyong85 in forum Marketplace
    Replies: 3
    -: 19-01-20, 17:04
  5. Parc Canberra EC
    By Tristan in forum Marketplace
    Replies: 0
    -: 10-12-19, 06:40

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •