    Quote Originally Posted by azeoprop
    This is their first project in Singapore right? Should be going a good job to ensure a good reputation.
    this is the first private condo project but their first housing development is the EC, Canopy in Yishun.. Yup.. hope they really put in effort to make it a nice place..

  2. #92
    Join Date
    Jul 2012
    Posts
    46

    Default

    [QUOTE=jenshuang]this is the first private condo project but their first housing development is the EC, Canopy in Yishun.. Yup.. hope they really put in effort to make it a nice place..[/

    CR overall looks nice and decent...much better than some other project. Believe they have put in much effort... Hope the interior will be just as nice

  3. #93
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by ESTUARY GUNDU
    Hi Bro
    do u have the project reference for CR so that i can check the corresponding btwn the devl n bca with regards to the site inspection. 19 Apr is for BCA-CSC-SITE INSPECTION APPLICATION or BCA-TOP-SITE INSPECTION?
    A1365-10003-2010-BP01 BCA-CSC-APPLN FOR SITE INSPECTION REQUEST REPLIED 22/03/2013 08:19:44

    Is CSC inspection. The guard said is on 19th of April ..

  4. #94
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by cedarlake1
    A1365-10003-2010-BP01 BCA-CSC-APPLN FOR SITE INSPECTION REQUEST REPLIED 22/03/2013 08:19:44

    Is CSC inspection. The guard said is on 19th of April ..
    Hi Bro
    I have checked the bca's website as today n indeed the developer has applied with csc application for site inspection. This is same as Estuary condo but the csc inspection is tomorrow as mentioned by the processing officer. U may call the relevant processing officer for clarrification of the inspection date for CR condo. If everything goes well with the inspection, I think developer will apply for BCA-TOP-APPLN. Approval usually takes about a month by bca before developer can release keys subject to no outstanding issue.
    Congrats to CR owners... I think maybe by mid May...below is status for Estuary condo....

    Plan Ref No. Application Type Status Date/Time View Details

    A0814-00013-2008-BP01 BCA-CSC-APPLN FOR SITE INSPECTION
    DATE CONFIRMED 25/03/2013 22:34:08 -
    Last edited by ESTUARY GUNDU; 31-03-13 at 14:04.

  5. #95
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by ESTUARY GUNDU
    Hi Bro
    I have checked the bca's website as today n indeed the developer has applied with csc application for site inspection. This is same as Estuary condo but the csc inspection is tomorrow as mentioned by the processing officer. U may call the relevant processing officer for clarrification of the inspection date for CR condo. If everything goes well with the inspection, I think developer will apply for BCA-TOP-APPLN. Approval usually takes about a month by bca before developer can release keys subject to no outstanding issue.
    Congrats to CR owners... I think maybe by mid May...below is status for Estuary condo....

    Plan Ref No. Application Type Status Date/Time View Details

    A0814-00013-2008-BP01 BCA-CSC-APPLN FOR SITE INSPECTION
    DATE CONFIRMED 25/03/2013 22:34:08 -
    Thanks Gundu,

    Our TOP will be very close for CA and Estuary...

  6. #96
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by cedarlake1
    Thanks Gundu,

    Our TOP will be very close for CA and Estuary...
    Really hope prices for both condos will appreciate much higher ...

  7. #97
    Join Date
    Apr 2010
    Posts
    1,739

    Default

    really impressed with CR's ceiling height... and of course it's construction speed

  8. #98
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by Komo
    really impressed with CR's ceiling height... and of course it's construction speed
    What is the CR's ceiling height?

  9. #99
    Join Date
    Apr 2010
    Posts
    1,739

    Default

    Quote Originally Posted by cedarlake1
    What is the CR's ceiling height?
    agent told me 2.9m now look at it could be about there

  10. #100
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by Komo
    agent told me 2.9m now look at it could be about there
    Wow, that's good, then I can install ceiling fans.

  11. #101
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by Komo
    really impressed with CR's ceiling height... and of course it's construction speed
    Quite standard for floor to ceiling height of 2.8-2.9m for condo. CR is low rise housing, 2.5 yesrs is normal speed I guess.. but other future projects may slow down due to less workers available.

    8CY also very fast. NV even faster!. Estuary is slightly over 3 years which I think also a normal speed. Just that nowadays, some ppl has high expectations on the speed. Anyway, choose those housing using precast system if u expect very fast construction time.

  12. #102
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by NorthernStar
    Quite standard for floor to ceiling height of 2.8-2.9m for condo. CR is low rise housing, 2.5 yesrs is normal speed I guess.. but other future projects may slow down due to less workers available.

    8CY also very fast. NV even faster!. Estuary is slightly over 3 years which I think also a normal speed. Just that nowadays, some ppl has high expectations on the speed. Anyway, choose those housing using precast system if u expect very fast construction time.
    what abt parc rosewood....lagi super fast!!!

  13. #103
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by ESTUARY GUNDU
    what abt parc rosewood....lagi super fast!!!
    fragrance's project usually ultra fast..

  14. #104
    Join Date
    Feb 2013
    Posts
    209

    Default

    Dear CRs

    Estuary condo obtained TOP.....yesterday...HUAT...!!!!!
    All the best to CRs....hurry up...TOP...TOP....

  15. #105
    Join Date
    Aug 2012
    Posts
    32

    Default

    Quote Originally Posted by ESTUARY GUNDU
    Dear CRs

    Estuary condo obtained TOP.....yesterday...HUAT...!!!!!
    All the best to CRs....hurry up...TOP...TOP....
    That's super fast, I thought the inspection just done? Anyway, congrats!

  16. #106
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by devilshin
    That's super fast, I thought the inspection just done? Anyway, congrats!
    i think that's not super fast...but rather slow already...normally developer will TOP about 6-9 months before the completion date....some even 12 months before..but i guess it's becos the size of the building...

  17. #107
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Fast plus most defects as registed in BCA

    Quote Originally Posted by NorthernStar
    fragrance's project usually ultra fast..

  18. #108
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by Noexit
    Fast plus most defects as registed in BCA
    Hi Bro
    where can u check those developers being registered with most defects by BCA at the BCA's website?

  19. #109
    Join Date
    Aug 2012
    Posts
    32

    Default

    Quote Originally Posted by ESTUARY GUNDU
    i think that's not super fast...but rather slow already...normally developer will TOP about 6-9 months before the completion date....some even 12 months before..but i guess it's becos the size of the building...
    Fast as in they just done the inspection, and got the TOP approved the same day, no need to wait for a month or two, like others.

  20. #110
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by devilshin
    Fast as in they just done the inspection, and got the TOP approved the same day, no need to wait for a month or two, like others.
    I am surprised too... I still see a wall facing Ave 2 need to be repaint as there is an obvious touch-up area...

  21. #111
    Join Date
    Aug 2012
    Posts
    32

    Default

    Quote Originally Posted by NorthernStar
    I am surprised too... I still see a wall facing Ave 2 need to be repaint as there is an obvious touch-up area...
    cross my fingers, hope CR follow the same

  22. #112
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by ESTUARY GUNDU
    Dear CRs

    Estuary condo obtained TOP.....yesterday...HUAT...!!!!!
    All the best to CRs....hurry up...TOP...TOP....
    Wow, Congrates!!! new home besides lake, what a beautiful dream come true...

  23. #113
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by cedarlake1
    Wow, Congrates!!! new home besides lake, what a beautiful dream come true...
    not only that..but with near walking distance to mrt...can sell away my car and take mrt to work...nice japanese food outlet at the bottle tree...the lush greenery nearby...cycling...jogging....fishing....

  24. #114
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by ESTUARY GUNDU
    not only that..but with near walking distance to mrt...can sell away my car and take mrt to work...nice japanese food outlet at the bottle tree...the lush greenery nearby...cycling...jogging....fishing....
    Japanese food in bottle tree? Is that good?

  25. #115
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by cedarlake1
    Japanese food in bottle tree? Is that good?
    Yup...there is a Japanese restuarant in bottle tree...but pai sei..food acceptable level...not so picky for me...

  26. #116
    Join Date
    Jan 2011
    Posts
    82

    Default

    Fibre optic is ready! Now waiting for TOP..

  27. #117
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by devilshin
    cross my fingers, hope CR follow the same
    i guess CR need one more paint coating to be nice...

  28. #118
    Join Date
    Aug 2012
    Posts
    32

    Default

    Quote Originally Posted by jenshuang
    Fibre optic is ready! Now waiting for TOP..
    Does that mean no need to engage someone for those ugly exposed wiring?
    BTW, urs is a unit with patio! Nice.

  29. #119
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by devilshin
    Does that mean no need to engage someone for those ugly exposed wiring?
    BTW, urs is a unit with patio! Nice.
    i guess the fibre only installed inside the DBbox.. You may still need to figure how to pull it out if you want to have the wireless unit somewhere else..

    My unit is not a patio, the pix i posted just a random check on the units within CR.. my unit also had the fibre installed as indicated in open-net website.

  30. #120
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    You could request from BCA by dropping a mail from their related officer for public quires.

    Quote Originally Posted by ESTUARY GUNDU
    Hi Bro
    where can u check those developers being registered with most defects by BCA at the BCA's website?

Similar Threads

  1. Replies: 0
    -: 05-11-21, 11:42
  2. Provence Residence EC @ Canberra Link
    By handsometeck in forum Marketplace
    Replies: 0
    -: 03-11-20, 15:09
  3. Parc Canberra (Hoi Hup)
    By rsbeginner in forum Far North
    Replies: 3
    -: 20-02-20, 20:25
  4. PARC CANBERRA EC
    By yongyong85 in forum Marketplace
    Replies: 3
    -: 19-01-20, 17:04
  5. Parc Canberra EC
    By Tristan in forum Marketplace
    Replies: 0
    -: 10-12-19, 06:40

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •