Page 3 of 9 FirstFirst 12345678 ... LastLast
Results 61 to 90 of 268

Thread: Canberra residence

  1. #61
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by cedarlake1
    Anybody noticed the sign of Canberra Residences already posted along Sembawang road?

    Work well in progress..
    congrats to all CR owners the sign CR up faster than estuary

  2. #62
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by ESTUARY GUNDU
    congrats to all CR owners the sign CR up faster than estuary
    Thanks Gundu!

    I regret I did not buy estuary......

  3. #63
    Join Date
    Aug 2012
    Posts
    32

    Default

    Went by the area around 7:45pm last night, while the sky almost turned dark, I saw many workers were still working hard on planting trees, touching up the wall, clearing the car park and also installing something in some units. While happy to see they are making progress, but still feel that plenty of time is needed to complete the whole thing. SAD.

    At the same time, found out that they use the following model of Oven and Hood, from Bosch, as promised.

    Oven:
    http://www.bosch-home.com.sg/product...?source=browse

    Hood: **90cm, not sure they use the same model across the project though.
    http://www.bosch-home.com.sg/product...?source=browse

  4. #64
    Join Date
    Jul 2012
    Posts
    46

    Default

    Congrats to CR owners...the place was nicely done up. Walk pass and kind of like the design of border fence along the main road and the signage. Hope TN also can be as nice!!

  5. #65
    Join Date
    Jan 2011
    Posts
    82

    Default

    Taken 2 weeks ago...

  6. #66
    Join Date
    Jul 2009
    Posts
    1,036

    Default

    why there is no listing in propertyguru for this project? there are some units left unsold right?

  7. #67
    Join Date
    May 2009
    Posts
    1,449

    Default

    Quote Originally Posted by ESTUARY GUNDU
    congrats to all CR owners the sign CR up faster than estuary
    Is different project of different quantum ley...

    On other hand, I must say that CR progress pretty smoothly ...the boundary use the mix of flat bar grill and concrete wall(entrance road) and developer did not save on it by using gal wire mesh grill..

  8. #68
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by ay123
    why there is no listing in propertyguru for this project? there are some units left unsold right?
    It was fully sold.. but guess there are 2 return units..

  9. #69
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by zzz1
    Is different project of different quantum ley...

    On other hand, I must say that CR progress pretty smoothly ...the boundary use the mix of flat bar grill and concrete wall(entrance road) and developer did not save on it by using gal wire mesh grill..
    there are some portion also using wire mesh grill (next to Jalan sendudok) and many firemen access doors..

    But so far no complaint from owner..haha

  10. #70
    Join Date
    Jul 2009
    Posts
    1,036

    Default

    Quote Originally Posted by NorthernStar
    It was fully sold.. but guess there are 2 return units..
    Do u know the asking for the penthouse unit? the 1528sf size?

  11. #71
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by ay123
    Do u know the asking for the penthouse unit? the 1528sf size?
    nope.. i don't know who is going to sell...

  12. #72
    Join Date
    Aug 2008
    Posts
    85

    Default

    Quote Originally Posted by jenshuang
    Taken 2 weeks ago...
    Nice ...!

  13. #73
    Join Date
    Jun 2009
    Posts
    5,675

    Default

    Progress ultra fast indeed!

  14. #74
    Join Date
    Mar 2010
    Posts
    9

    Smile

    Quote Originally Posted by ay123
    Do u know the asking for the penthouse unit? the 1528sf size?
    $1,188,888 nett.
    Ps PM or call 94597012 if keen to find out more. psf at $778, and TOPing soon... Facing outside, not pool facing

  15. #75
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by andyt
    $1,188,888 nett.
    Ps PM or call 94597012 if keen to find out more. psf at $778, and TOPing soon... Facing outside, not pool facing
    Wah, very cheap!

  16. #76
    Join Date
    Mar 2010
    Posts
    9

    Default

    Quote Originally Posted by cedarlake1
    Wah, very cheap!
    both unit sold.

  17. #77
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by andyt
    both unit sold.
    Don't tell me ay123 bought both!

  18. #78
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by azeoprop
    Progress ultra fast indeed!
    Their original plan is to complete on Q4 2012..Now considered delay by at least 4months ..Contracted TOP date is 2015

  19. #79
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by andyt
    both unit sold.
    Good to know that it is "Fully sold" again...

  20. #80
    Join Date
    Mar 2010
    Posts
    9

    Default

    I heard keys collection in 2 weeks , April/May..
    anyway, will be soon

  21. #81
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by andyt
    I heard keys collection in 2 weeks , April/May..
    anyway, will be soon
    Not possible...

  22. #82
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by andyt
    I heard keys collection in 2 weeks , April/May..
    anyway, will be soon
    has the developer apply for TOP or CSC inspection? Did u check with BCA?
    I don't think key collection for CR is earlier than Estuary...

  23. #83
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by ESTUARY GUNDU
    has the developer apply for TOP or CSC inspection? Did u check with BCA?
    I don't think key collection for CR is earlier than Estuary...
    Their last keys collection can be faster than estuary.. they got only 320 units..

  24. #84
    Join Date
    Jun 2009
    Posts
    5,675

    Default

    This is their first project in Singapore right? Should be going a good job to ensure a good reputation.

  25. #85
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by ESTUARY GUNDU
    has the developer apply for TOP or CSC inspection? Did u check with BCA?
    I don't think key collection for CR is earlier than Estuary...
    The BCA inspection is on 19 April for CR. expected TOP by end of May earliest.

  26. #86
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by cedarlake1
    The BCA inspection is on 19 April for CR. expected TOP by end of May earliest.
    Hi Bro
    do u have the project reference for CR so that i can check the corresponding btwn the devl n bca with regards to the site inspection. 19 Apr is for BCA-CSC-SITE INSPECTION APPLICATION or BCA-TOP-SITE INSPECTION?

  27. #87
    Join Date
    Feb 2013
    Posts
    209

    Default

    Quote Originally Posted by NorthernStar
    Their last keys collection can be faster than estuary.. they got only 320 units..
    yup...since only half of estuary...indeed can be faster than us congrats

  28. #88
    Join Date
    Feb 2013
    Posts
    209

    Default BCA-QUALITY MARK QM

    Is CR registered for QM?

  29. #89
    Join Date
    Jan 2011
    Posts
    82

    Default

    Quote Originally Posted by ESTUARY GUNDU
    Is CR registered for QM?
    CR is not registered for QM but it awarded the green mark platinum. So, to a certain sense, the materials used and design are controlled and monitored by BCA.

  30. #90
    Join Date
    Jan 2011
    Posts
    82

Similar Threads

  1. Replies: 0
    -: 05-11-21, 11:42
  2. Provence Residence EC @ Canberra Link
    By handsometeck in forum Marketplace
    Replies: 0
    -: 03-11-20, 15:09
  3. Parc Canberra (Hoi Hup)
    By rsbeginner in forum Far North
    Replies: 3
    -: 20-02-20, 20:25
  4. PARC CANBERRA EC
    By yongyong85 in forum Marketplace
    Replies: 3
    -: 19-01-20, 17:04
  5. Parc Canberra EC
    By Tristan in forum Marketplace
    Replies: 0
    -: 10-12-19, 06:40

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •