congrats to all CR owners the sign CR up faster than estuaryOriginally Posted by cedarlake1
congrats to all CR owners the sign CR up faster than estuaryOriginally Posted by cedarlake1
Thanks Gundu!Originally Posted by ESTUARY GUNDU
I regret I did not buy estuary......
Went by the area around 7:45pm last night, while the sky almost turned dark, I saw many workers were still working hard on planting trees, touching up the wall, clearing the car park and also installing something in some units. While happy to see they are making progress, but still feel that plenty of time is needed to complete the whole thing. SAD.
At the same time, found out that they use the following model of Oven and Hood, from Bosch, as promised.
Oven:
http://www.bosch-home.com.sg/product...?source=browse
Hood: **90cm, not sure they use the same model across the project though.
http://www.bosch-home.com.sg/product...?source=browse
Congrats to CR owners...the place was nicely done up. Walk pass and kind of like the design of border fence along the main road and the signage. Hope TN also can be as nice!!
Taken 2 weeks ago...
why there is no listing in propertyguru for this project? there are some units left unsold right?
Is different project of different quantum ley...Originally Posted by ESTUARY GUNDU
On other hand, I must say that CR progress pretty smoothly ...the boundary use the mix of flat bar grill and concrete wall(entrance road) and developer did not save on it by using gal wire mesh grill..
It was fully sold.. but guess there are 2 return units..Originally Posted by ay123
there are some portion also using wire mesh grill (next to Jalan sendudok) and many firemen access doors..Originally Posted by zzz1
But so far no complaint from owner..haha
Do u know the asking for the penthouse unit? the 1528sf size?Originally Posted by NorthernStar
nope.. i don't know who is going to sell...Originally Posted by ay123
Nice ...!Originally Posted by jenshuang
Progress ultra fast indeed!
$1,188,888 nett.Originally Posted by ay123
Ps PM or call 94597012 if keen to find out more. psf at $778, and TOPing soon... Facing outside, not pool facing
Wah, very cheap!Originally Posted by andyt
both unit sold.Originally Posted by cedarlake1
Don't tell me ay123 bought both!Originally Posted by andyt
Their original plan is to complete on Q4 2012..Now considered delay by at least 4months ..Contracted TOP date is 2015Originally Posted by azeoprop
Good to know that it is "Fully sold" again...Originally Posted by andyt
I heard keys collection in 2 weeks , April/May..
anyway, will be soon
Not possible...Originally Posted by andyt
has the developer apply for TOP or CSC inspection? Did u check with BCA?Originally Posted by andyt
I don't think key collection for CR is earlier than Estuary...
Their last keys collection can be faster than estuary.. they got only 320 units..Originally Posted by ESTUARY GUNDU
This is their first project in Singapore right? Should be going a good job to ensure a good reputation.
The BCA inspection is on 19 April for CR. expected TOP by end of May earliest.Originally Posted by ESTUARY GUNDU
Hi BroOriginally Posted by cedarlake1
do u have the project reference for CR so that i can check the corresponding btwn the devl n bca with regards to the site inspection. 19 Apr is for BCA-CSC-SITE INSPECTION APPLICATION or BCA-TOP-SITE INSPECTION?
yup...since only half of estuary...indeed can be faster than us congratsOriginally Posted by NorthernStar
Is CR registered for QM?
CR is not registered for QM but it awarded the green mark platinum. So, to a certain sense, the materials used and design are controlled and monitored by BCA.Originally Posted by ESTUARY GUNDU