PDA

View Full Version : Seletar Park Residence (D28, 99 leasehold, Tuan Sing)



Pages : 1 [2]

lifeline
31-01-13, 16:50
found the Seletar Regional Centre...


http://img268.imageshack.us/img268/3671/mapofregionalcentresins.png

HCL
31-01-13, 20:22
"The Seletar Regional Centre has the potential to grow to two times the size of the Tampines Regional Centre. Located next to it is the Seletar Aerospace Park which will provide a range of activities including training"

If I look at 2008 Master Plan, there is a huge reserve land (in yellow) beside the Seletar Aerospace Park. This shall be the land for SRC. I believe this reserve land will change into for commercial use in coming 2013 Master Plan

phantom_opera
05-02-13, 21:41
2013-01-24 SELETAR PARK RESIDENCE 17 SELETAR ROAD #XX-XX 28 99 YRS FROM 2011 581 735,258 1,265
2013-01-24 SELETAR PARK RESIDENCE 17 SELETAR ROAD #XX-XX 28 99 YRS FROM 2011 592 756,000 1,277psf

HCL
06-02-13, 08:39
2013-01-24 SELETAR PARK RESIDENCE 17 SELETAR ROAD #XX-XX 28 99 YRS FROM 2011 581 735,258 1,265
2013-01-24 SELETAR PARK RESIDENCE 17 SELETAR ROAD #XX-XX 28 99 YRS FROM 2011 592 756,000 1,277psf

Seem developer can hold the price

GT23
09-02-13, 19:13
Left a couple of 4 bedders..

HCL
17-02-13, 13:03
Latest report from URA

13 UNITS sold in Jan and left 24 unsold.

High - $1306/psf
Mid - $1275/psf
Low = $ 748/psf

I am tracking the price but seem it did not go down base on the URA transaction record.

Does anyone know whether the developer gives away voucher or other discounts that would not reflect in the transaction price?

aerobic
22-03-14, 12:31
Hi owners here? Is there a forum for Seletar Park Residence Owners?

HCL
23-03-14, 08:57
Hi owners here? Is there a forum for Seletar Park Residence Owners?

Seem there isn't any. This thread is quiet for quite sometimes

I had my dinner few weeks ago. The Greenwich building is quite nice from outside. Anyone know when will be the TOP?

GT23
03-08-15, 08:36
Was at Greenwich V recently and saw that SPR is quite ready for TOP. Developer and surveyors are rushing for last minute job! TOP date in S&P is 30 Sep 2015.

azeoprop
04-08-15, 01:58
Hopefully the final product will look as high end as the brochure and showflat.

HCL
06-08-15, 13:14
Was at Greenwich V last week and take this opportunity to view SPR. The workers still doing the gardening and the path way. Also saw workers rushing to finish some units. May be SPR can not ready for inspection by Sep but doubt TOP can be obtained next month.

My wife actual prefer Greenwich external look than SPR. Hope the finishing quality is good

GT23
17-09-15, 07:29
SPR received the TOP status on 14 Sep. FYI.

HCL
04-10-15, 10:13
Hopefully the final product will look as high end as the brochure and showflat.

Was at the site this weekend. The final product at club house, pool and surrounding are very nice. But those units facing landed property are too close especially block 21 low floor facing a wall from balcony. Did not have chance to see the unit inside finalizing. Any comments?

Seletarer
11-10-15, 10:00
The workmanship on floor is disappointing. Marble tiles with "cracked veins", cabinet laminates had many dents and scratches and patches on flooring.

HCL
11-10-15, 18:49
The workmanship on floor is disappointing. Marble tiles with "cracked veins", cabinet laminates had many dents and scratches and patches on flooring.

Tuan Sing shall earn quite a lot with this project. They won the bid at $467psf. So the breakeven cost shall be around$800+

Do the law protect buyer if the finishing is bad? Even the developer willing to do the repair or further touch up, it is still losing on buyer sides (eg. lost on rental, continue paying monthly maintenance fee ... etc

pluto
11-10-15, 21:48
Do liaise with the person in charge. I don't own a unit here but for the price paid, quality must be assured.
From experience, just threaten to go to CASE to file a report, that should expedite the replacement process.