Took a pic of the show model. Rubbish dump should be the small building covered in greens. Looks neat .. So I guess it doesn't really matter la. in fact the small road in front makes it v convenient for the occupants to load or unload bulky stuffs...

Let me know if anyone wants more pics of the show model, cos I took quite a few then

http://i33.tinypic.com/2mwb8dx.jpg

Hi, I'm new to this forum. I've bought a unit too and am excited about the development. Not sure if construction will be curtailed by the foreign labour crunch this year. Also, I was wondering if it's possible to change some of the fixtures given by UOL. I've emailed UOL but they completely ignored my enquiry :(

Can zeamybro share more model pics? I did not snap any photo when I was at the showroom so now I'm left with little memory of how the development would turn out to be :(

Thanks!

zeamybro
21-04-13, 00:06
Hi, I'm new to this forum. I've bought a unit too and am excited about the development. Not sure if construction will be curtailed by the foreign labour crunch this year. Also, I was wondering if it's possible to change some of the fixtures given by UOL. I've emailed UOL but they completely ignored my enquiry :(

Can zeamybro share more model pics? I did not snap any photo when I was at the showroom so now I'm left with little memory of how the development would turn out to be :(

Thanks!

You can call up UOL directly. The right procedure should be getting your lawyer to write in your request officially to their lawyer, and they will respond accordingly. They may or may not entertain your request.

Ok, I will try to share more model pics. Any stacks in particular you want to see?

Win
21-04-13, 10:55
Thanks zeamybro! Can you share stack 40 pics? By the way do I have to pay my lawyer to write the letter of request?

zeamybro
21-04-13, 15:17
Thanks zeamybro! Can you share stack 40 pics? By the way do I have to pay my lawyer to write the letter of request?

Depends on law firms, but usually they don't charge.

Ok here are some pics of stack 40 / Blk 515

http://i33.tinypic.com/o931mq.jpg

http://i35.tinypic.com/2u95n5d.jpg

http://i37.tinypic.com/2e3cykk.jpg

http://i37.tinypic.com/2i91kqp.jpg

http://i33.tinypic.com/x7y3s.jpg

ppty
21-04-13, 15:42
hello - anyone have the pictures of block 525

please post thanks

zeamybro
21-04-13, 15:49
hello - anyone have the pictures of block 525

please post thanks

They didn't include blk 525 in the show model

http://i33.tinypic.com/1zb5e8.jpg

Win
22-04-13, 08:34
Wow zeamybro you must have taken a lot of photos there. I thought phototaking is not allowed so I didn't even take any. Thanks so much!

Win
22-04-13, 08:40
I realised the blocks facing the road are topped with water tanks while the rest have nice curvy brown tops...

benedictlimcw
22-04-13, 13:10
I realise that all ground floor units have some covering above in the form of the brown wooden trellis. Do you think there will be some plastic covering on top of the trellis to provide shelter from falling objects and rain?


Hi, I'm new to this forum. I've bought a unit too and am excited about the development. Not sure if construction will be curtailed by the foreign labour crunch this year. Also, I was wondering if it's possible to change some of the fixtures given by UOL. I've emailed UOL but they completely ignored my enquiry :(

Can zeamybro share more model pics? I did not snap any photo when I was at the showroom so now I'm left with little memory of how the development would turn out to be :(

Thanks!

Welcome!

Fairy
25-04-13, 17:23
I tried to request for changes but it wasnt very well-entertained... I cant really recall as it was some time back but there are definitely charges involved. In the end, did not change anything.. anyone managed to make any changes?

tria123
25-04-13, 18:41
I tried to request for changes but it wasnt very well-entertained... I cant really recall as it was some time back but there are definitely charges involved. In the end, did not change anything.. anyone managed to make any changes?
I email the developer few months ago, the reply is they no longer allow custom change regarding flooring due to previous have cases cause the delay of the construction progress.

electron
25-04-13, 18:55
I realise that all ground floor units have some covering above in the form of the brown wooden trellis. Do you think there will be some plastic covering on top of the trellis to provide shelter from falling objects and rain?



Welcome!

Not too sure about Archi, but in most cases, you'll install the covering yourself. The installation depends on the Management Commitee. Most condos will allow you to install a PVC covering on the trellis. There'll be guidelines as to colour (usually clear only) and size.

You may have to agree to clean the trellis when it gets dirty/debris gets trapped on it, as part of the conditions for installation. The MC will ensure you clean it up. I'm familiar because one of my units is a 2nd floor with a patio unit beneath it.

Hope that helps.

oreo
25-04-13, 20:57
I agree they weren't very receptive to changes... Unlike what my agent had initially said prior to sale...

benedictlimcw
26-04-13, 10:45
Not too sure about Archi, but in most cases, you'll install the covering yourself. The installation depends on the Management Commitee. Most condos will allow you to install a PVC covering on the trellis. There'll be guidelines as to colour (usually clear only) and size.

You may have to agree to clean the trellis when it gets dirty/debris gets trapped on it, as part of the conditions for installation. The MC will ensure you clean it up. I'm familiar because one of my units is a 2nd floor with a patio unit beneath it.

Hope that helps.

Guess will have to see how it turns out before deciding what to do. Gotta wait 2+ more years.


I agree they weren't very receptive to changes... Unlike what my agent had initially said prior to sale...

Anyone had experience with UOL about their receptiveness to changes? Had thought that it is normally unlikely that developers would want to cater to individual units changes as it is hard to monitor such changes.

Win
26-04-13, 13:41
Hi Benedict, you mentioned 2+ more years to go? I thought I saw someone put on forum that uol estimates top to be on end 2014?

Fairy
26-04-13, 17:11
Hi Benedict, you mentioned 2+ more years to go? I thought I saw someone put on forum that uol estimates top to be on end 2014?

I think it is est. to TOP at end of 2014, but not sure if really can..

Anyone has updated pics of progress?? :)

zeamybro
26-04-13, 23:09
UOL actually accepted my request to change from homogeneous tiles to marble, with a top up of a few k. I sent in my request through the lawyer. That was in mid 2012 I think.... Eventually I didn't proceed though

benedictlimcw
27-04-13, 23:17
Hi Benedict, you mentioned 2+ more years to go? I thought I saw someone put on forum that uol estimates top to be on end 2014?

I am just tapering my expectations. From the progress, it doesn't seem like it would be possible. But who knows? :D Pray for the best, but moderate expectation.

Fairy
03-05-13, 11:13
UOL actually accepted my request to change from homogeneous tiles to marble, with a top up of a few k. I sent in my request through the lawyer. That was in mid 2012 I think.... Eventually I didn't proceed though

Hi Zeamybro, why didnt you proceed? Is it the cost?

Fairy
03-05-13, 11:14
I am just tapering my expectations. From the progress, it doesn't seem like it would be possible. But who knows? :D Pray for the best, but moderate expectation.

Tt's a good way to manage our own expectations :)

Fairy
03-05-13, 11:17
Any kind souls went there and took photos? Long time didn't see the updated progress le... :P

Blocks seem to be quite close hor, for those pool facing ones... wonder if it would be too close for comfort.. haha! distance is 25m for closest blocks? from balcony to balcony?

zeamybro
03-05-13, 23:23
Hi Zeamybro, why didnt you proceed? Is it the cost?

Hi fairy, the quote was reasonable but I didn't really like the choice of the marble used. Plus I was having a bad experience with marble on another unit, so decided to keep the homogeneous tiles or change to other kind of floorings upon top.

lbb
04-05-13, 03:42
Hi fairy, the quote was reasonable but I didn't really like the choice of the marble used. Plus I was having a bad experience with marble on another unit, so decided to keep the homogeneous tiles or change to other kind of floorings upon top.

Care to share what was the bad experience that you faced with marble?

zeamybro
04-05-13, 08:36
Care to share what was the bad experience that you faced with marble?

This unit has soft white marble which is very beautiful to look at. Unfortunately after 1 yr, there is this middle piece that turns orangey, plus a few other pieces having the same orange stains at the edge. Consulted the experts and they claimed it was due to moisture and rust, so I bought some expensive chemicals to treat the affected pieces. The stains were successfully removed and marble restored to original outlooks, but the stains came back a few days later again. There was no pipe running below, so I can't really figure out why.

Marble is definitely nice, but perhaps it's better to choose those colour and type which are easier to maintain. Sorry not an expert here ... So can't advice much.

zeamybro
04-05-13, 10:25
Any kind souls went there and took photos? Long time didn't see the updated progress le... :P

Blocks seem to be quite close hor, for those pool facing ones... wonder if it would be too close for comfort.. haha! distance is 25m for closest blocks? from balcony to balcony?

How can I possibly turn down a fairy's request? May the fairy bless our compound ...ya

http://i43.tinypic.com/3463hch.jpg

http://i42.tinypic.com/30hsdgj.jpg

http://i41.tinypic.com/o6w749.jpg

lbb
04-05-13, 10:31
This unit has soft white marble which is very beautiful to look at. Unfortunately after 1 yr, there is this middle piece that turns orangey, plus a few other pieces having the same orange stains at the edge. Consulted the experts and they claimed it was due to moisture and rust, so I bought some expensive chemicals to treat the affected pieces. The stains were successfully removed and marble restored to original outlooks, but the stains came back a few days later again. There was no pipe running below, so I can't really figure out why.

Marble is definitely nice, but perhaps it's better to choose those colour and type which are easier to maintain. Sorry not an expert here ... So can't advice much.

Got it bro, appreciate it (:

Fairy
06-05-13, 10:04
How can I possibly turn down a fairy's request? May the fairy bless our compound ...ya

http://i43.tinypic.com/3463hch.jpg

http://i42.tinypic.com/30hsdgj.jpg

http://i41.tinypic.com/o6w749.jpg

You are so kind, zeamybro. :) Defintely will bless this compound.:cheers4:

Btw, have you made the 2nd payment already?

Win
06-05-13, 12:20
Seems like most stacks are ready except for the center bits? By the way, I wonder how is the townhouse construction progress.

benedictlimcw
07-05-13, 10:12
How can I possibly turn down a fairy's request? May the fairy bless our compound ...ya


Thanks zeamybro. The progress looks good.



You are so kind, zeamybro. :) Defintely will bless this compound.:cheers4:

Btw, have you made the 2nd payment already?

Only paid the 1st payment early last month, now calling for 2nd payment already arh. So fast!



Seems like most stacks are ready except for the center bits? By the way, I wonder how is the townhouse construction progress.

Drove past, but can't really see anything. Anyone managed to take a "top down" photo of the area? :cheers6:

panamera
07-05-13, 21:46
Looks a bit dense

Fairy
10-05-13, 09:20
Looks a bit dense

Hi Panamera, did you have a unit here too?

It does look quite massive, wondering if anyone has pics that shows the distance b/w blocks...

zeamybro
10-05-13, 22:52
Hi Panamera, did you have a unit here too?

It does look quite massive, wondering if anyone has pics that shows the distance b/w blocks...

There u go archifairy. I guess these 2 blocks should be block 505 and 529.

http://i44.tinypic.com/rk6d1g.jpg

http://www.archipelago.new.sg/image/video/SitePlanFull.gif

panamera
12-05-13, 19:09
Hi Panamera, did you have a unit here too?

It does look quite massive, wondering if anyone has pics that shows the distance b/w blocks...

I did consider and studied it quite a bit but in the end gave it a pass. Like the concept tho.

Fairy
13-05-13, 12:52
There u go archifairy. I guess these 2 blocks should be block 505 and 529.

http://i44.tinypic.com/rk6d1g.jpg

http://www.archipelago.new.sg/image/video/SitePlanFull.gif

Thanks Zeamybro!! :ashamed1: So touched..

Fairy
13-05-13, 12:55
I did consider and studied it quite a bit but in the end gave it a pass. Like the concept tho.

i c.. I juz hope it turns out alright.. considered really long before committing..

selespeed5135
13-05-13, 23:41
Hi all,

Been reading this forum once in a while for the past 6 months.

Thanks for contributions.

We stay in Tampines
Made the booking in early Dec 2011, Pre-Launch.
selected a high floor unit nearest to the town centre, facing .... err.... the hdb car park.:D
Wanted a unit with the most living space, and affordable, thus the selection.
My wife told me she loved this project, and we have waited too long, hoping for the price of private property to fall :banghead: ; i was given only 2 days to decide :doh: .... i went along with her for it :D

Dont know if it is a sound investment, but at least it wont go very wrong based on our liking of the environment, convenience of the town centre, and there is an mrt not too far away. We wanted a place to stay for good, and conducive for my kids to grow. I would say that the park in the reservoir itself is a very nice venue for outdoor activities, and to relax and be slightly closer too nature.

I was surprised how quickly the project was sold out from mid to end of 2012. It was stagnant for a while after its launch. I guess the high prices of other projects later on, convinced buyers to return to the archi option.

:) :) :)

benedictlimcw
14-05-13, 15:50
Hi all,

Been reading this forum once in a while for the past 6 months.

Thanks for contributions.

We stay in Tampines
Made the booking in early Dec 2011, Pre-Launch.
selected a high floor unit nearest to the town centre, facing .... err.... the hdb car park.:D
Wanted a unit with the most living space, and affordable, thus the selection.
My wife told me she loved this project, and we have waited too long, hoping for the price of private property to fall :banghead: ; i was given only 2 days to decide :doh: .... i went along with her for it :D

Dont know if it is a sound investment, but at least it wont go very wrong based on our liking of the environment, convenience of the town centre, and there is an mrt not too far away. We wanted a place to stay for good, and conducive for my kids to grow. I would say that the park in the reservoir itself is a very nice venue for outdoor activities, and to relax and be slightly closer too nature.

I was surprised how quickly the project was sold out from mid to end of 2012. It was stagnant for a while after its launch. I guess the high prices of other projects later on, convinced buyers to return to the archi option.

:) :) :)

Welcome future neighbour to be!

Yes, love the nature behind the condo. Went up one day and looked down over the reservoir from the top of the little "hill" and found it was very beautiful and calming. Probably do a few picnics there once I shift in.

I was one of those that choose it in 2H 2012 because of the high prices of similar sized units in other developments nearby.

Fairy
15-05-13, 16:41
Hi all,

Been reading this forum once in a while for the past 6 months.

Thanks for contributions.

We stay in Tampines
Made the booking in early Dec 2011, Pre-Launch.
selected a high floor unit nearest to the town centre, facing .... err.... the hdb car park.:D
Wanted a unit with the most living space, and affordable, thus the selection.
My wife told me she loved this project, and we have waited too long, hoping for the price of private property to fall :banghead: ; i was given only 2 days to decide :doh: .... i went along with her for it :D

Dont know if it is a sound investment, but at least it wont go very wrong based on our liking of the environment, convenience of the town centre, and there is an mrt not too far away. We wanted a place to stay for good, and conducive for my kids to grow. I would say that the park in the reservoir itself is a very nice venue for outdoor activities, and to relax and be slightly closer too nature.

I was surprised how quickly the project was sold out from mid to end of 2012. It was stagnant for a while after its launch. I guess the high prices of other projects later on, convinced buyers to return to the archi option.

:) :) :)

Welcome! I was there during launch too but didnt commit that time.. too many units to choose from actually makes it difficult to decide (haha!) and prices was high too..

Seems you were quite determined to choose this project.. why were you given 2 days to decide? Were you not worried about buying at the peak, the slow movement after launch and the reputation of the reservoir as an attraction for the wrong reason? These were some of my concerns at that time...

bakasa2002
15-05-13, 22:52
Hi all,

Been reading this forum once in a while for the past 6 months.

Thanks for contributions.

We stay in Tampines
Made the booking in early Dec 2011, Pre-Launch.
selected a high floor unit nearest to the town centre, facing .... err.... the hdb car park.:D
Wanted a unit with the most living space, and affordable, thus the selection.
My wife told me she loved this project, and we have waited too long, hoping for the price of private property to fall :banghead: ; i was given only 2 days to decide :doh: .... i went along with her for it :D

Dont know if it is a sound investment, but at least it wont go very wrong based on our liking of the environment, convenience of the town centre, and there is an mrt not too far away. We wanted a place to stay for good, and conducive for my kids to grow. I would say that the park in the reservoir itself is a very nice venue for outdoor activities, and to relax and be slightly closer too nature.

I was surprised how quickly the project was sold out from mid to end of 2012. It was stagnant for a while after its launch. I guess the high prices of other projects later on, convinced buyers to return to the archi option.

:) :) :)

I rem I was at the launch too ... there wasn't much discount and prices were around 1100psf for 3br. It was quite high in Dec 2011 especially after dunno which CM not long before this launch. I think Bedok Residences had a good launch about a few weeks ago and that triggered a CM ... :D

selespeed5135
16-05-13, 01:07
Welcome! I was there during launch too but didnt commit that the timde.. too many units to choose from actually makes it difficult to decide (haha!) and prices was high too..

Seems you were quite determined to choose this project.. why were you given 2 days to decide? Were you not worried about buying at the peak, the slow movement after launch and the reputation of the reservoir as an attraction for the wrong reason? These were some of my concerns at that time...

Hi, it wasn't me who was determined to buy, I was traveling a lot most of the time.
My wife was pretty much sold to it. I just went along w her, since I had only 2 days to decide. So far no regrets. We committed ard 04 Dec, the CM was announced 07 Dec. Price was high, but we had already waited too long for it to fall. It's a place for us to stay, not for quick turnaround for profit.

kane
16-05-13, 08:38
With a place that you like, it is very difficult to be precise about what is a good price to pay for because of the emotional aspect. Just enjoy the stay most importantly.

Zeus
17-05-13, 00:03
I just got an email from my lawyer asking payment of the further 10%.
Will make appt next week for payment and to sign the Mortgage documents as well. Passed by archi yesterday , blk 509 started installing windows already. And blk 501 just started building up.

Zeus
17-05-13, 00:17
I just got an email from my lawyer asking payment of the further 10%.
Will make appt next week for payment and to sign the Mortgage documents as well. Passed by archi yesterday , blk 509 started installing windows already. And blk 501 just started building up.
Sorry blk 505 just started installing windows not 509.

selespeed5135
17-05-13, 14:49
Anybody in this forum bought blk 535?

Fairy
17-05-13, 16:57
I just got an email from my lawyer asking payment of the further 10%.
Will make appt next week for payment and to sign the Mortgage documents as well. Passed by archi yesterday , blk 509 started installing windows already. And blk 501 just started building up.

Hi Zeus, do we need to make appt with lawyer for payment and sign mortgage docs? thought just adjust the amount to pay based on the loan disbursed?

Zeus
18-05-13, 00:31
Hi Zeus, do we need to make appt with lawyer for payment and sign mortgage docs? thought just adjust the amount to pay based on the loan disbursed?
For my case, yes , thats normally the practice i think, we have to make all initial cheque payment to the lawyer and the further 10% of the purchase price once the foundation is built, normally after a year. The bank will disburse half of amount and another half to be paid in cheque to the lawyer ,myself.

Yes, the signing of mortgage document also have to go thru our lawyer. Well they ask me to make an appointment with them, they need to explain the contract and all the clauses in detail, it may take times. My first appt with lawyer last year took more than 2 hours , that's including waiting time, photocopying documents by their staff, explaining and signing stacks of documents. After all, my lawyer is assigned by the UOL, in house banker UOB bank. I think it is a standard practice for private property purchase.

Zeus
18-05-13, 00:35
Anybody in this forum bought blk 535?

Hi there, not sure about that, mine is Blk 501, ground floor.

Zeus
18-05-13, 01:00
Hi there, not sure about that, mine is Blk 501, ground floor.
Climbing up the opposite hdb to see the latest development, they just started building 501 and 503. The strata house , 531, 533 and 535 , tractors still digging to built the foundation. Once the foundation is ready it is going to be quite fast to built the rest.

bakasa2002
18-05-13, 16:56
Climbing up the opposite hdb to see the latest development, they just started building 501 and 503. The strata house , 531, 533 and 535 , tractors still digging to built the foundation. Once the foundation is ready it is going to be quite fast to built the rest.

Zeus, next time you can take the lift instead of the stairs ... It will be less of a workout ...:D

ppty
18-05-13, 18:08
Anybody in this forum bought blk 535?

525 - the block on slightly higher ground

Fairy
21-05-13, 16:56
For my case, yes , thats normally the practice i think, we have to make all initial cheque payment to the lawyer and the further 10% of the purchase price once the foundation is built, normally after a year. The bank will disburse half of amount and another half to be paid in cheque to the lawyer ,myself.

Yes, the signing of mortgage document also have to go thru our lawyer. Well they ask me to make an appointment with them, they need to explain the contract and all the clauses in detail, it may take times. My first appt with lawyer last year took more than 2 hours , that's including waiting time, photocopying documents by their staff, explaining and signing stacks of documents. After all, my lawyer is assigned by the UOL, in house banker UOB bank. I think it is a standard practice for private property purchase.

Hi Zeus,

Sori, still dun understand... you mean your bank will only disburse half and you have to pay the other half in cash?

I also went thru the 1st appt around an hr or more but there's no mention of next appt leh...

It's strange for me... your's exceptional case?

Zeus
22-05-13, 22:16
Hi Zeus,

Sori, still dun understand... you mean your bank will only disburse half and you have to pay the other half in cash?

I also went thru the 1st appt around an hr or more but there's no mention of next appt leh...

It's strange for me... your's exceptional case?
Not sure about yours. May bd different. U can check with your lawyer for more detail.

Bun
10-06-13, 23:53
Hi, I am new here. So happy I found this thread. As I was wondering why the developer did not ask for the foundation completion payment, after reading this thread I realized 531 still in progress of digging.... The posted photos were amazing. Thanks for the updates and sharing. Cheers.... Will continue follow this thread.

zeamybro
11-06-13, 00:04
Hi, I am new here. So happy I found this thread. As I was wondering why the developer did not ask for the foundation completion payment, after reading this thread I realized 531 still in progress of digging.... The posted photos were amazing. Thanks for the updates and sharing. Cheers.... Will continue follow this thread.

Hi bun, welcome to the community!

Yeah 531 shld be occupying the former showflat spot, so it will be slightly slower than the rest. But you ve gotten yourself a good choice, so near to the reservoir park.

bakasa2002
11-06-13, 11:29
Hi bun, welcome to the community!

Yeah 531 shld be occupying the former showflat spot, so it will be slightly slower than the rest. But you ve gotten yourself a good choice, so near to the reservoir park.

The constructions does not seem to have progress much compare to the WF series as I drove past it recently. UOL did indicate that estimated TOP in Q4 2014. Will they be on track? I think their spottiswoode R doesn't look like gonna TOP in Q4 2013 either based on current progress ...

http://www.uol.com.sg/attachments/sgx/71668EAC6E496E0148257B67002CCBE9/UOL_Investor_Meeting_presentation_13May2013.pdf

zeamybro
11-06-13, 13:56
The constructions does not seem to have progress much compare to the WF series as I drove past it recently. UOL did indicate that estimated TOP in Q4 2014. Will they be on track? I think their spottiswoode R doesn't look like gonna TOP in Q4 2013 either based on current progress ...

http://www.uol.com.sg/attachments/sgx/71668EAC6E496E0148257B67002CCBE9/UOL_Investor_Meeting_presentation_13May2013.pdf

If my memory doesn fail me, Archi was launched more than a year later than the last of the WF series? I personally thought the progress was amazing cos each time i drive past, i see big changes. Anyway, official TOP is 2016, so Q4-2014 would be a super big bonus.

And based on WB's schedule, i think UOL should be fairly accurate. Katong Regency seems to be progressing very well too.

Zeus
14-06-13, 00:30
If my memory doesn fail me, Archi was launched more than a year later than the last of the WF series? I personally thought the progress was amazing cos each time i drive past, i see big changes. Anyway, official TOP is 2016, so Q4-2014 would be a super big bonus.

And based on WB's schedule, i think UOL should be fairly accurate. Katong Regency seems to be progressing very well too.

I remember if i am not wrong Archi was launch in Dec 2011.
Based on my observation it seems quite impossible for them to TOP in Q4 2014. Looking from the opposite block, the progress of the construction looks like slowing down a bit, not as fast as before or may be, man-power crunch. There are still many blocks yet to be built, like 501, 503, 531, 533, 535 and 24 strata's houses. Plus the other end ( left side) of the plot, 515,517,519. That does not include all the facilities. So may be, i guess TOP end of 2015. On the positive side, with that date, at least it gave us more time to plan and save more money to buy all new furnitures for the brand new apartment, lol.

Win
14-06-13, 10:31
Hi does anyone has photos of the construction progress?

zeamybro
14-06-13, 11:05
I personally dont mind this project taking longer time to build, as the DTL3 is probably going to take several more years to be ready. I guestimate TOP should be Q1/Q2 2015.

benedictlimcw
18-06-13, 01:58
I personally dont mind this project taking longer time to build, as the DTL3 is probably going to take several more years to be ready. I guestimate TOP should be Q1/Q2 2015.

I'm currently staying at another DTL3 station, so don't need to wait for it to complete ... I want Archi ASAP! :D


Hi, I am new here. So happy I found this thread. As I was wondering why the developer did not ask for the foundation completion payment, after reading this thread I realized 531 still in progress of digging.... The posted photos were amazing. Thanks for the updates and sharing. Cheers.... Will continue follow this thread.

Welcome Bun!:cheers6:

Fairy
18-06-13, 11:19
hihi everyone!

This thread has been quiet for a while... I wish Archi to be ready soon too but I think the earliest possible is probably Q42014..

Bun, which unit type did you buy? Are you staying in Bedok currently too? :)

benedictlimcw
19-06-13, 19:11
Hi does anyone has photos of the construction progress?

Here you go:
http://i43.tinypic.com/33v0r5u.jpg
http://i40.tinypic.com/345htf6.jpg
http://i41.tinypic.com/2zhpbwk.jpg

benedictlimcw
15-08-13, 14:30
The latest announcement from UOL puts the Archipelago TOP at 1Q 2015 now. Used to be 4Q 2014.

See Slide 21:
http://infopub.sgx.com/Apps?A=COW_CorporateAnnouncement_Content&B=AnnouncementLast3MonthsByCompanyNameAndCategory&F=886438&fileId=UOL_Investor_Meeting_14_Aug_2013.pdf

Meyer88
15-08-13, 17:23
That's still very fast

zeamybro
15-08-13, 17:24
http://i39.tinypic.com/2w655e1.jpg

http://i41.tinypic.com/wa10s4.jpg

http://i39.tinypic.com/2r7ah5d.jpg

http://i40.tinypic.com/wgrp6d.jpg

benedictlimcw
16-08-13, 11:15
That's still very fast
Tiong Seng's Pre-Fab at work :)




Thanks for the photo update. Seems they are starting on the foundation for the Strata houses. Finishing this in 1.5 years would be quite amazing.

Zeus
19-08-13, 15:32
The latest announcement from UOL puts the Archipelago TOP at 1Q 2015 now. Used to be 4Q 2014.

See Slide 21:
http://infopub.sgx.com/Apps?A=COW_CorporateAnnouncement_Content&B=AnnouncementLast3MonthsByCompanyNameAndCategory&F=886438&fileId=UOL_Investor_Meeting_14_Aug_2013.pdf
Thank you so much for the latest UOL update. Time is nearing i am getting excited.

chiaberry
21-08-13, 14:48
Next 10% progress payment has been called. :cool:

benedictlimcw
23-08-13, 13:57
Next 10% progress payment has been called. :cool:

Which 10%? Reinforced Concrete Works? Paid mine very early this month.

Win
23-08-13, 14:43
Which 10%? Reinforced Concrete Works? Paid mine very early this month.

I haven't receive any notice of the next 10%. My stack is not even up :(

zeamybro
23-08-13, 23:22
I think should be the partition wall and ceiling payment 5+5

ppty
24-08-13, 10:08
Hi are u guys referring to the 10% that make up to the total 30% ?

i paid that last year...

benedictlimcw
26-08-13, 14:43
Hi are u guys referring to the 10% that make up to the total 30% ?

i paid that last year...

Downpayment - 20% - Paid
Foundation Work - 10% - Paid
Reinforced Concrete - 10% - Paid (This is what I just paid earlier this month)
Partition Walls - 5%
Ceiling - 5%
Door/Window Frames - 5%
Car Park/Roads/Drains - 5%
TOP - 25%
CSC - 15%

Homefinder
02-10-13, 12:04
Hi everyone!
realise that this thread is not active for more than a month.
u guys have any update on the construction progress?? I am a owner staying overseas.:o

Fairy
04-10-13, 17:51
Hi everyone!
realise that this thread is not active for more than a month.
u guys have any update on the construction progress?? I am a owner staying overseas.:o

I have a pic, hope it's clear.. taken around mid-Sep

Where do you stay currently, Homefinder?

Homefinder
05-10-13, 14:44
I have a pic, hope it's clear.. taken around mid-Sep

Where do you stay currently, Homefinder?


Thanks Fairy!
I am staying in Dubai at the moment.

Fairy
07-10-13, 11:13
Thanks Fairy!
I am staying in Dubai at the moment.

You're welcome!

Wow working in Dubai! What attracts you to Archi? Your family staying nearby?

Wonder when we can get the place... waiting waiting...keke..

Darwin
07-10-13, 22:54
You're welcome!

Wow working in Dubai! What attracts you to Archi? Your family staying nearby?

Wonder when we can get the place... waiting waiting...keke..

I'm waiting and counting down by the months too...Think got to be 2015 looking at its progress..

Homefinder
08-10-13, 13:39
You're welcome!

Wow working in Dubai! What attracts you to Archi? Your family staying nearby?

Wonder when we can get the place... waiting waiting...keke..


I'm a East Lover. Used to stay in Tampines... always like the reservoir and low rise building. Archi fits well....
Hope the development will turn out nice but afraid it will be very cramp....

I am updated thro this forum. Thanks future fellow neighbours!:p

zeamybro
08-10-13, 18:01
Taken on 08 Oct 2013

http://i41.tinypic.com/2he9axj.jpg

http://i43.tinypic.com/28qsr50.jpg

http://i39.tinypic.com/qs1dvr.jpg

http://i42.tinypic.com/2qmok02.jpg

http://i42.tinypic.com/2ah60j5.jpg

http://i41.tinypic.com/5btyxw.jpg

Fairy
09-10-13, 14:49
I'm waiting and counting down by the months too...Think got to be 2015 looking at its progress..

Welcome Darwin!

Yes... most likely 2015 first half...

Is there any way that we can get the floor plan or something and check out some interior designs first? So that we dun waste time once we get the keys.. haha!

Fairy
09-10-13, 14:52
Thanks Zeamybro! You pictures are really sharp and clear :)

Fairy
09-10-13, 14:54
I'm a East Lover. Used to stay in Tampines... always like the reservoir and low rise building. Archi fits well....
Hope the development will turn out nice but afraid it will be very cramp....

I am updated thro this forum. Thanks future fellow neighbours!:p

I'm also thinking whether it is too cramped... gosh.. what kind of unit u got? 1/2/3BR? Which facing?

Noexit
09-10-13, 15:02
I'm also thinking whether it is too cramped... gosh.. what kind of unit u got? 1/2/3BR? Which facing?

because lots of buyes will never ask block to block how many meters when they buliding up they reliease to close to each other . :banghead:

Noexit
09-10-13, 15:43
this is also another project in east - seastrand so close block to block

ppty
09-10-13, 17:50
Probably distance between 30m to 50m -




because lots of buyes will never ask block to block how many meters when they buliding up they reliease to close to each other . :banghead:

zeamybro
09-10-13, 19:44
Thanks Zeamybro! You pictures are really sharp and clear :)

Fairy, you are welcome. Recently busy with my new place so hardly visit archi site to check out the progress. I also believe the project will top sometime in early 2015.

If u visit the site, u will see that the stacks are actually not that close to one another ... Given that it's a low rise project, I don't think the project will feel very cramped.. so don't worry.

Fairy
10-10-13, 16:33
Fairy, you are welcome. Recently busy with my new place so hardly visit archi site to check out the progress. I also believe the project will top sometime in early 2015.

If u visit the site, u will see that the stacks are actually not that close to one another ... Given that it's a low rise project, I don't think the project will feel very cramped.. so don't worry.

Thanks for your reassurance, zeamybro!

Your new place at Waterbank right. keke.. U staying there with your family I supposed or it's an investment unit?

zeamybro
10-10-13, 17:03
Thanks for your reassurance, zeamybro!

Your new place at Waterbank right. keke.. U staying there with your family I supposed or it's an investment unit?

Hahaha, u have good memory! No la, currently keeping waterbank as a weekend home and to host simple gatherings ... Will rent it out next time when the interest dies down

benedictlimcw
12-10-13, 21:48
Thanks for the photos and update Zeamybro.

Eagerly awaiting the completion, but still long way more. Sigh.

zeamybro
17-10-13, 17:54
http://i40.tinypic.com/2h53e2q.jpg


http://i39.tinypic.com/24c79dl.jpg

http://i39.tinypic.com/2eyuidw.jpg

benedictlimcw
17-10-13, 20:03
They are starting to build the houses.

Wonder if the distance from the houses to the apartments is far enough for privacy.

bakasa2002
17-10-13, 20:41
progress seems to have slowed, I thought it will be completed next year but it seems to have slowed down ... Manpower crunch?

bakasa2002
20-11-13, 23:45
DMP2013 looks like have relocated the plot right next to Bedok North MRT to be used for hospital. Good or bad news. :eek:

zeamybro
21-11-13, 06:53
DMP2013 looks like have relocated the plot right next to Bedok North MRT to be used for hospital. Good or bad news. :eek:

Not surprised since the location is easily accessible by PIE, TPE and the bartley viaduct... Makes it quite ideal.

The plot is indeed super big. Good news would be having a pool of medical professionals as potential tenants, and proximity to medical care. But this is just a masterplan, May or may not be materialized.

zeamybro
24-11-13, 09:25
Pic taken from URA gallery - Draft Masterplan 2013 exhibition.

Somehow I feel they love to feature Archi whenever there is any mentioning of private projects being near nature parks and yet within walking distance to amenities and (future) MRT.

Few mths ago Archi was featured on channelnewsasia on the same topic.

http://i42.tinypic.com/fykif9.jpg

zeamybro
10-12-13, 16:38
http://i42.tinypic.com/2q1bbia.jpg

http://i41.tinypic.com/2055jdz.jpg

http://i44.tinypic.com/15o6m9u.jpg

http://i40.tinypic.com/2mgtqpf.jpg

http://i43.tinypic.com/9knnsi.jpg

http://i41.tinypic.com/259zhhl.jpg

http://i42.tinypic.com/fktiya.jpg

http://i43.tinypic.com/674e9u.jpg

focus
10-12-13, 21:21
The very expensive CLUSTER at right beside the public Rubbish Dump. LOL

selespeed5135
22-12-13, 01:27
The very expensive CLUSTER at right beside the public Rubbish Dump. LOL

:scared-4:you are happy that they spent (wasted) a lot of money buying expensive cluster next to rubbish dump:confused::confused::confused:

probably you are not our neighbor...:doh:

BTW, i am not staying at the expensive cluster too, could not afford it, but they are really nice and big units. ;)

Darwin
10-01-14, 06:45
Hi good day! I received my next 10% payment for the completion of reinforced framework..finally!

Does anyone knows how long it takes typically for the remaining 5% x 4?

minority
10-01-14, 07:02
nice greenery.. but blocks looks too close.

sunboy77
10-01-14, 22:23
Really love this project.

Probably the only condo built right inside the Bedok Reservior park, so need no crossing of that very busy Bedok Resevoir Rd to get to the park.

Near to MRT station.

Next to HDB amenities such as kopi shops and supermarkets.

Fairy
14-01-14, 16:18
Went to take a look at the board that stated the date of completion. It says 1-Dec-2014. Is it possible or even accurate?

zeamybro
16-01-14, 21:53
Went to take a look at the board that stated the date of completion. It says 1-Dec-2014. Is it possible or even accurate?

Thanks fairy for the pic.

I am guessing construction completion date in dec 14 may be possible, but that doesn't mean it will TOP soon after. Typically, much time will be catered for rounds of inspections and rectifications to be done.

I have had a unit which project construction was completed in Jan but the TOP was dragged till Jul the same year. But UOL seems to be always v fast.. Their Katong Regency is progressing v fast

insigina
17-01-14, 09:44
Thanks fairy for the pic.

I am guessing construction completion date in dec 14 may be possible, but that doesn't mean it will TOP soon after. Typically, much time will be catered for rounds of inspections and rectifications to be done.

I have had a unit which project construction was completed in Jan but the TOP was dragged till Jul the same year. But UOL seems to be always v fast.. Their Katong Regency is progressing v fast

Katong Regency is fast due to uol vested interest. The condo is sold out and the mall waiting to collect rent.

Fairy
22-01-14, 16:29
Thanks fairy for the pic.

I am guessing construction completion date in dec 14 may be possible, but that doesn't mean it will TOP soon after. Typically, much time will be catered for rounds of inspections and rectifications to be done.

I have had a unit which project construction was completed in Jan but the TOP was dragged till Jul the same year. But UOL seems to be always v fast.. Their Katong Regency is progressing v fast

Hi zeamybro,

Thanks for your reply. :) Hopefully around middle 2015 we can move in there. :D

benedictlimcw
22-01-14, 21:25
Hi zeamybro,

Thanks for your reply. :) Hopefully around middle 2015 we can move in there. :D

I also hope so too :)

oreo
23-01-14, 00:14
Pics taken earlier in the week.

fiyo
23-01-14, 07:02
Thanks for all the updates! Really exciting!! :cheers4:

benedictlimcw
24-01-14, 14:14
Pics taken earlier in the week.

Thanks for the pics.

They need to hurry up. The strata titled houses haven't even started.

oreo
02-03-14, 22:14
Another update, taken today. 02 March. Looks unlikely to be ready by year end!

fiyo
03-03-14, 00:21
Realistically I think should be ready some time in 2015.

benedictlimcw
03-03-14, 00:37
Another update, taken today. 02 March. Looks unlikely to be ready by year end!

As announced by UOL, it is estimated to be completed in 1Q 2015. And as some other forumer said, it could take a while for TOP after that. So maybe 2Q 2015 if we are lucky.

fiyo
03-03-14, 08:58
Can't wait for it to be completed but certainly won't want them to rush and not do a good job. It's taking shape and it's getting really exciting! :cheers1:

fiyo
03-03-14, 08:59
Thanks Oreo for the update!

howe
24-04-14, 00:08
Hi Guys, just chanced upon this forum on google search and am I glad to find so much discussion and details here on Archipelago. I too bought a unit when they first launched, on launch night itself actually. The wait had been so long but am I glad to see the project finally coming to form. :banana:

benedictlimcw
24-04-14, 08:27
Hi Guys, just chanced upon this forum on google search and am I glad to find so much discussion and details here on Archipelago. I too bought a unit when they first launched, on launch night itself actually. The wait had been so long but am I glad to see the project finally coming to form. :banana:

Welcome Howe. The project is progressing, and I expect it will take at least 1 more year to complete.

Anyone have any updated photos of the place?

zeamybro
26-04-14, 12:26
Welcome howe.

http://i57.tinypic.com/69gf4k.jpg

http://i60.tinypic.com/166ndpe.jpg

http://i60.tinypic.com/kao76r.jpg

http://i62.tinypic.com/302op3c.jpg

benedictlimcw
28-04-14, 00:14
Welcome howe.

http://i57.tinypic.com/69gf4k.jpg

http://i60.tinypic.com/166ndpe.jpg

http://i60.tinypic.com/kao76r.jpg

http://i62.tinypic.com/302op3c.jpg

Thanks for the photos as usual zeamybro.

Doesn't look promising that they will finish in a year's time.

Homefinder
28-04-14, 11:57
Hello future archi residents,

I agreed with Benedict.
will be very tough to complete 100% in 1 year....
Maybe only the units will be ready by then but need to know if they have started the internal finishing works.
From the pictures, only can see the side facing the roads. How about those blocks that started late???

i was expecting to collect keys by this time next year.....:banghead:

insigina
28-04-14, 14:35
Thanks for the photos as usual zeamybro.

Doesn't look promising that they will finish in a year's time.

In UOL's presentation to shareholders on 28 Feb 14, they have a slide showing Archipelago estimated TOP in 1Q15 and Katong Regency 2Q15. With some luck, they may just pull through.

benedictlimcw
28-04-14, 20:34
Hello future archi residents,

I agreed with Benedict.
will be very tough to complete 100% in 1 year....
Maybe only the units will be ready by then but need to know if they have started the internal finishing works.
From the pictures, only can see the side facing the roads. How about those blocks that started late???

i was expecting to collect keys by this time next year.....:banghead:

I was expecting to collect this time next year also. Hopefully as what Insigina pointed out, UOL will keep its promise to its shareholders and TOP in 1Q 2015. Perhaps they are doing all the internal finishings first then complete the outside.


In UOL's presentation to shareholders on 28 Feb 14, they have a slide showing Archipelago estimated TOP in 1Q15 and Katong Regency 2Q15. With some luck, they may just pull through.

devilsmaya
11-05-14, 16:25
Hello all, im new here and you can call me Adam. I bought a 1 bedroom unit at Archipelago two years ago and is very excited to see its progress. I have also created a FB page for residents so that we can all share updates there. See link (Archipelago@Bedok Reservoir Residents Group): https://www.facebook.com/groups/277067039115308/

benedictlimcw
12-05-14, 11:12
Hello all, im new here and you can call me Adam. I bought a 1 bedroom unit at Archipelago two years ago and is very excited to see its progress. I have also created a FB page for residents so that we can all share updates there. See link (Archipelago@Bedok Reservoir Residents Group): https://www.facebook.com/groups/277067039115308/

Great idea Adam! Have submitted my request to join. Thanks.

Zeus
26-05-14, 12:37
Hello all, im new here and you can call me Adam. I bought a 1 bedroom unit at Archipelago two years ago and is very excited to see its progress. I have also created a FB page for residents so that we can all share updates there. See link (Archipelago@Bedok Reservoir Residents Group): https://www.facebook.com/groups/277067039115308/

Welcome on board Adam, finally someone make the initiative to create FB for all of us , future neighbor. I am Zac, bought it April 2012, the much long awaited for TOP is nearing soon. The unit that I bought Blk 501, ground flr, seems to be completed from the exterior, started painting already. Due to the long waited TOP, this forum was 'quiet and dead' for a while as nothing much to talk about, hope we can 'jump start' the forum again here or the FB , to share topics where to buy furniture, any good interior design or contractor to recommend.

Homefinder
07-06-14, 22:53
Hi Guys...

I will like to check if you have spotted this....
Really like to know if the developer will to provide the bind shades outside the masterbed room balcony....

I cant see this item install for those blocks that has almost complete....

What u guys think?

Fairy
01-07-14, 14:13
Hihi Homefinder,

Went down to Archi recently and saw the shades that you are looking for :) so dun worry. See attached pic. Also saw the surronding "walls" which are kind of disappointing.. looks quite basic... but at least it's black color which doesnt look tt bad...

Cas88per
02-07-14, 12:10
Hihi Homefinder,

Went down to Archi recently and saw the shades that you are looking for :) so dun worry. See attached pic. Also saw the surronding "walls" which are kind of disappointing.. looks quite basic... but at least it's black color which doesnt look tt bad...

Thanks Fairy for the pictures.

omg... The surrounding wall looks like some cheap fencing!

Pretty disappointing! :mad:

benedictlimcw
05-07-14, 22:57
Wow ... is this the kind of fencing we are going to get all around the estate!

wkang1970
06-07-14, 21:57
Wow ... is this the kind of fencing we are going to get all around the estate!


Hmm.... This fencing really look cheapo....

zeamybro
03-08-14, 22:44
First sub sale for archi? Quite an impressive price considering it's still quite sometime to TOP and is also doing better than neighboring projects.

http://i59.tinypic.com/2rp5zrr.jpg

benedictlimcw
04-08-14, 16:07
First sub sale for archi? Quite an impressive price considering it's still quite sometime to TOP and is also doing better than neighboring projects.

http://i59.tinypic.com/2rp5zrr.jpg

Wow, his SSD would be about 12%. Would he have made a profit on this sale?

zeamybro
04-08-14, 22:05
Wow, his SSD would be about 12%. Would he have made a profit on this sale?

Should be 8% ssd since project was launched in late 2011. Think selling price is more than enough to cover stamp duty and ssd... but definitely worth it if owner is selling to save on absd for a bigger unit.

Arcachon
17-09-15, 09:36
https://scontent-cdg2-1.xx.fbcdn.net/hphotos-xaf1/v/t1.0-9/11987209_10153636021249375_3761443483095422386_n.jpg?oh=ac6957fa96afb8a5aeda1522230b7470&oe=565DAD73

https://www.facebook.com/groups/277067039115308/

zeamybro
31-10-15, 00:09
Photo contributions from various owners :)

Sharing with fellow forummers here :D

http://i64.tinypic.com/2crrq6e.jpg

http://i67.tinypic.com/2zixxeh.jpg

http://i65.tinypic.com/fvci6s.jpg

http://i68.tinypic.com/2wm2v7c.jpg

http://i67.tinypic.com/ipnsc4.jpg

http://i64.tinypic.com/2dhi9fa.jpg

http://i64.tinypic.com/2vaf48x.jpg

azeoprop
11-12-15, 20:20
https://scontent-sin1-1.xx.fbcdn.net/hphotos-xpf1/v/t1.0-9/12240082_1070730476357992_7336882910028629009_n.jpg?oh=454ad37b0aff7e0d53b674c5ec35db9c&oe=56E09426

Mavis Hee!
许美静!

Kelonguni
11-12-15, 22:04
Very pleasant looking. 香屋配美女。